Laserfiche WebLink
Back -up generator — gas line: <br />a. 10 Kv or less .............. ............................... 30.00 <br />b. Over IOKv ................. ............................... 50.00 <br />........................... <br />Eachre- inspection ................................................................ ............................... 2500 30.00 <br />20 Each additional final inspection ........................................... ............................... 20.00 60.00 <br />(e) All plumbing installations requiring a permit shall be inspected by the plumbing <br />inspector three (3) times, once each for underground work, rough -enin work, and final <br />completion. A complete line test shall also be supervised by the plumbing inspector. The <br />plumbing permit holder shall notify the plumbing inspector at least twenty -four (24) hours in <br />advance of the time the work is ready for inspection. If the work does not pass inspection, a <br />reinspection fee of twenty five dellafs thirty dollars ($30.00) shall be charged for each future <br />inspection of that stage of work. <br />Section V. Chapter 6, Article 1, Section 6 -24(c) of the South Bend Municipal Code be <br />and hereby is amended to read as follows: <br />(c) Fees. Each application for a permit for installation or alteration of electrical wiring or <br />equipment shall be accompanied by fees in accordance with the schedule below; with a <br />minimum permit fee of twenty dell ..s ($20.00) thirty dollars ,$30.00): <br />(1) Temporary service for construction: <br />Allamperage .............................. ..............................$ <br />7.00 <br />(2) Switchboards and panel boards each, new and <br />replaced: <br />60- amp ....................................... ............................... $ <br />7.00 <br />100- amp ..................................... ............................... <br />9.00 <br />200 - amp ..................................... ............................... <br />12.00 <br />400 - amp ..................................... ............................... <br />15.00 <br />600 - amp ..................................... ............................... <br />20.00 <br />Over 600 -amp to 2,000 amp ...... ............................... <br />25.00 <br />Over 2,000 amp ......................... .... ............................ <br />50.00 <br />(3) Circuits (new or replaced): <br />a. Each circuit ............................ ............................... <br />5.00 <br />(4) Horsepower (machinery): <br />a. First hp ................................... ............................... <br />7.00 <br />b. Each additional hp ................. ............................... <br />0.25 <br />(5) Back -up generator: <br />a. 10 Kv or less. <br />30.00 <br />b. Over 10 Kv. <br />50.00 <br />(5)(6) Pool wiring and/or bonding ........ ..........................20.00 30.00 <br />(6)(7) Repair, extension, and/or maintenance of wiring ......... <br />20.08 30.00 <br />(7)(8) Reset, relocation, reconnect fees, each ........................... <br />20.00 30.00 <br />(8)(9) Each re- inspection fee ............................ ..........................25.00 <br />30.00 <br />(9)-LUO Each additional final inspection ............ ..........................50.00 60.00 <br />8 <br />