My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/1923 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1923
>
03/13/1923 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:59:10 PM
Creation date
9/5/2018 10:33:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/13/1923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bid of Pike Construction Co. <br />Grading per cu. yd. <br />$1.00 <br />S. Asphalt Trinidad per'sq.`yd. <br />3.13 <br />S. Asphalt Mexican per sq. YD. <br />2.89 <br />Asphaltic,conerete Mexican per sq. yd. <br />2.60 <br />Asphaltiq concrete Trinidad per sq. yd. <br />2.80 <br />8, inch conduit pipe per lin ft., <br />.38 <br />Stomp water inlets each <br />10.00 <br />u Marginal,eurb per lin ft. <br />.35 <br />Resetting inlets, each <br />3.00 <br />v Resetting manhole covers, each <br />3.00 <br />Certified e;}Iteek 0410.00 <br />Bid of White Construction Co, <br />WalW per sq. ft <br />.20 <br />curb per lin ft. <br />.50 <br />• grading per ca. yd. <br />1.05 <br />S. Asphalt Trinidad per sq. yd. <br />3.18 <br />S. Asphalt Mexican per sq,. yd. <br />2.98 <br />• Asphaltio. conerete Mexican per seg yd, <br />2.63 <br />Asphaltic concrete Trinidad per sq. yd,. <br />2.83 <br />8ain,eh conduit pipe per lin ft. <br />1.00 <br />Stox water .inlets, each <br />13.00 <br />Marginal curb per lin ft. <br />.40 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each_ <br />3.00 <br />Cheek 0410.00 <br />Bid of Williston Construction Company <br />Walk per sq. ft. <br />.20 <br />Curb per lin ft. <br />,60 <br />Grading per cu. yd. <br />1.00 <br />S. Asphalt Mexican per sq. yd. <br />2.82 <br />S. Asphalt Trinidad per sq. yd. <br />2.98 <br />Asphaltic per sq. yd. Mex. <br />2_.52 <br />,coierete <br />Asphaltic eonerete Trinidad per sq. yd. <br />2.68 <br />8 inch conduit pipe -.per lin ft. <br />.95 <br />Stow water inlets, each <br />14.50 <br />Marginal curb per lin ft. <br />.40 <br />Resetting inlets, each <br />3.00 <br />Resetting manholes curb sna deovers, <br />3.00 <br />Cheek $ 410.00 <br />PAVEMENTON LEER STREET. <br />Bid of Globe Construction Company. <br />Grading per cu. yd. . <br />$1.15 <br />S. Asphalt Trinidad.per.sq. yd. <br />3.27 <br />S. Asohalt Texicao per sq. yd, <br />3.Q4 <br />Asphaltic concrete Triniad per sq. y4. <br />2.91 <br />• Asphaltic concrete Texicie Oil per sq. yd.2.72 <br />8 inch conduit per lin ft. <br />1.25 <br />Storm water inlets, each <br />15.00 <br />Marginal curt per lin ft. <br />.50 <br />Resetting inlets, each <br />5.00 <br />Resetting manholes curbs and covers, eaeh 5.00 <br />Check $485.00 <br />Bid of Pike Construeion Company. <br />Grading per cu, yd. <br />.98 <br />S. Asphalt Triniad per sq. yd. <br />3.07 <br />S. Asphalt Standard Mexican per sq. yd. <br />2.83 <br />Asphaltic concrete Trinidad per sq. yd. <br />2.74 <br />Asphaltic eonerete Standard Mex. per sq. <br />2.54 <br />8 inch conduit per lin ft, <br />.88 <br />Storm waterinlets, each <br />10.00 <br />,Marginal curb per lin ft. <br />.35 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />Cheek $485.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.