My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/1923 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1923
>
03/13/1923 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:59:10 PM
Creation date
9/5/2018 10:33:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/13/1923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday March 13hh.9 1923. Continued. <br />Bid of White Construction Co. ' <br />walk per sq. ft. $.20 <br />Ourb per lin ft. .50 <br />Grading per cu. yd. 1.05 <br />S. Asphalt Trinldad' per sq. yd. 3.1.8 <br />S. asphalt Mexlean'per sq. yd. 2.98 <br />Asphaltic ebnerete Triniad per sq. yd. 2.63 <br />Asphaltic concrete Mexican per sq..yd. 2.63 <br />s <br />8 inch conduit pipe per lin.ft. 1.00 <br />Storm water inlets, each 13.00 <br />Marginal curb per lin ft. .40 <br />Resetting mnholes each 3.00 <br />Resetting inlets, each 3.00 <br />Check $485.00 <br />Bid of Williston Construction Co. <br />Walk per sq - ft. <br />.20 <br />Curb per lin ft. <br />.6o <br />Grading per cu. yd. <br />1.00 <br />S. Asphalt Mex. per sq. yd. <br />2.82 <br />S. Asphaltic Trinidad per sq. yd. <br />2.98 <br />Asphaltic concrete Mex. per sq. yd. <br />2.52 <br />Asphalts€ concrete Trinidad per sq. yd. <br />2.68 <br />8 inch conduit pipe per lin ft. <br />.95 <br />Storm wester inlets, each <br />14.50 <br />Marginal curb per lin ft. <br />.4o <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />Check $485.00 <br />Pavement on Fassnacht Avenue. <br />Bid of Globe Construction Co. <br />Grading per cu, yd. 1.15 <br />Si Asphalt Trinidad per sq yd'. 3.27 <br />S. Asphalt Texiee per 'sq. yd. 3.04. <br />'Asphaltic eonerete'Trinidad per sq. yd. 2.91 <br />"Asphaltic concrete Texicc per sq. yd. 2.72 <br />"8 inch conduit pipe per lin ft. 1.25 <br />'Storm water inlets, each 15.00 <br />Marginal curb per li'n ft. .50 <br />Resetting inlets, .each 5.00 <br />Resetting manhole covers, each 5.00 <br />Check $748.00 <br />Bid of Pike Construction Company <br />Grading par 'cu. yd. <br />.98 <br />S. Asphalt Trinidad per sq. yd. <br />3.11 <br />S. Asphalt Standard Mexican pr sq. yd. <br />2.87 <br />Asphaltic concrete Triniad per sq. yd.. <br />2.78 <br />Asphaltic concrete Mexican Standard per <br />yd.2.58 <br />8 inch conduit pipe per lin ft. <br />.88 <br />Storm water inlets, each <br />10.00 <br />Marginal curb per lin ft. <br />.35 <br />Resetting inlets, each <br />3.00 - <br />Resetting manhole curbs and covers, each <br />3.00 <br />Check $748:00 <br />Bif of the White Construction Co. <br />walk per sq. ft. <br />y <br />.20 <br />Curb per lin ft. <br />.50 <br />Grading per cu, yd. <br />1.05 <br />S. Asphalt Trinidad per sq. <br />yd.3.18 <br />S. Asphalt Mexican per sq. yd. <br />2. 98 <br />Asphaltic concrete Mex. oil <br />per sq. yd. <br />2.63 <br />Asphaltic concrete Trinidad <br />per sq. yd. <br />2.,83 <br />8 inch conduit pipe per lin <br />ft. <br />1.00 <br />Storm water inlets, each <br />13.00 <br />Marginal curb per lin ft. <br />.40 <br />Resetting inlets, each <br />3.00 <br />Resetting manholescurbs and <br />covers, each <br />3.00 <br />Check $748.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.