Laserfiche WebLink
745 <br />Tuescle,y March 13th., 1923. Continued. <br />Bid of the Wulliston Construction Co. ° <br />Walk per sq. ft. ° <br />' Curb per"Yin°ft. <br />' Grading per cu. yd. " <br />° S. Asphalt Mexican per sq. yd. <br />S. Asphalt Trinidad per sq. yd, <br />8sphaltie concrete Mexican per sq. yd. <br />Asphaltic concrete Trinidad per sq. yd. <br />8 inch conduit•pipe'per lin fl.. <br />Storm water inlets, each <br />Marginal curb per lin ft. <br />Resetting islets, each <br />Resetting manholes per each <br />° Check $711.00 <br />PAVEMENT ON CARROLL STREET. <br />Rid of Globe Construction Ce. <br />Grading per cu., yd. <br />S. Asphalt Trinidad per sq. yd. <br />9-;'Asphalt Sexiao oil per sq. yd. <br />" Asphaltic" concrete Trinidad per sq. yd. <br />Asphaltic concrete. Texice oil per sq.. yd. <br />8 inch conduit, pipe per lin-ft. <br />• Storm water inlets, each <br />• Margi _jeurb per lin ft. <br />Resetting' inlets, each <br />Resetting manholes curbs and covers, each <br />Y Cheek $105.00 <br />Bid of White Construction Co, <br />Walk per sq. ft. <br />' Curb per lin ft. a <br />Grading per cu. yd. <br />' S. Asphalt Trinidad per sq. yd. <br />S. Asphalt Mexican per sq. yd. <br />Asphaltic concrete Mexican per sq. yd. <br />Asphalti.e concrete Trinidad per sq. yd. <br />8 inch conduit pipe per lin ft. <br />" Storm water inlets, each <br />Marginal curb per lin ft. <br />Resetting inlets, each <br />Reseeting manhole covers, each <br />Check $105.00 <br />Bid of Williston Construction Company <br />Walk per sq. ft. <br />Curb per lin ft. <br />Grading-per.cu. yd. <br />S. Asphalt Mexican per sq, yd. <br />S. Asphalt Trinidad per sq. yd. <br />Asphaltic concrete Mexican per sq. yd. <br />PAVEMENT ON MARINE STREET. <br />Bid of Globe Constr. Co. <br />0.20 <br />.6o <br />1.00 <br />2.82 <br />2.98 <br />2.52 <br />2.68 <br />.95 <br />14.50 <br />.40 <br />3.00 <br />3.00 <br />1.15 <br />3.27 <br />3.04. <br />2.91 <br />2.7.2 <br />1.25 <br />15.00 <br />.50 <br />5.00 <br />5.00 <br />.20 <br />.50 <br />1.05 <br />3.18 <br />2.63 <br />2.83 <br />1.00 <br />13.00 <br />.40 <br />3.00 <br />3.00 <br />.20 <br />.6o <br />1.00 <br />2.82 <br />2.98 <br />2.52 <br />Grading per cu. yd. 1.15 <br />S. Asphalt Trinidad p r sq. yd. 3.27 <br />S. Asphalt Taxies per sq. yd. 3.04 <br />Asphaltic concrete Trinidad per sq. yd. 2.91 <br />Asphaltic concrete Taxies per sq. yd. . 2.72 <br />Conduit pipe per lin ft. 1.25 <br />Storm water inlets, each 15.00 <br />Marginal curb per lin ft. .50 <br />Resetting inlets, each 5.00 <br />Resetting manholes curbs and covers, each 5.00 <br />Check $410.00 <br />