My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/1923 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1923
>
03/13/1923 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:59:10 PM
Creation date
9/5/2018 10:33:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/13/1923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ism <br />Bid of White Construction Company <br />Walk per sq. ft. S.20 <br />Curb per lin ft. .50 <br />w Grading per cu. yd. 1.05 <br />Asphal-b Trinidad per sq. yd 3.18 <br />Asphalt Mexican per sq, yd. 2.78 <br />Asphaltic concrete Trini elid per sq.. yd. 2.83 <br />Asphayltio 'conerete Mexican. per sq. `yd. 2.63 <br />8 inch conduit pipe per lin ft. 1.00 <br />Storm water inlets,'each 13.00 <br />Marginal curb per lin ft. .40 <br />Resetting inlets, each 3.00 <br />Resetting manhole eovers, each 3.00 <br />Check $19�.00 <br />Bid of Williston% Construction Company <br />walk per sq. ft. <br />.20 <br />Curbing per lin ft, <br />.60 <br />° Grading per cu, yd. <br />1.00 <br />S.° Asphalt Mexican per sq, yd. <br />2.82 <br />S. Asphalt Trinidad per sq. yd. <br />2.98 <br />Asphaltic concrete Mexican per sq. yd. <br />2.52 <br />Asphaltic concrete Trinidad per sq. yd. <br />2.68 <br />6 inch conduit pipe perlin ft. <br />.95 <br />' Storm water inlets, each <br />14.50 <br />' Marginal curb per lin ft. <br />.40' <br />Resenting inlets, each <br />3.00 <br />Resettinig manhole covers, each <br />3.00 <br />Check $193.00 <br />PAVEMENT ON HARRISON AVENUE. <br />Bid of Glebe'Construetion Cc. <br />Grading per cu.'yd. 1.15 <br />S. Asphalt Trinidad per sq. yd. 3.27 <br />S. Asphalt Texice oil asphalt per sq. yd. 3.04 <br />Asphaltic concrete Trinidad per sq. yd. 2.91 <br />Asphaltic concrete Toxic* asphalt per sq. yd 2.72 <br />8 inch conduit pipe per lin ft. .50 <br />Resetting inlets, each 5.00 <br />Resenting manhole curbs and covers, each 5.00 <br />Cheek $711.00 <br />Bid of the Pike Construction Company <br />Grading per cu. yd. <br />.95 <br />. Asphalt Tri �dc1aa gg r, sq. ° yd.. <br />3.10 <br />S. Asphalt; 1IM98 Akkrgd. <br />2.86 <br />Asphaltip concrete Mexican per sq. yd. <br />2.57 <br />Asphaltic concrete Trinidad per sq. yd. <br />2.77 <br />8 inch conduit pipe per lin ft. <br />Marginal curb per lin ft. <br />.35 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each <br />3-POO <br />Cheek $711.. <br />Bid of the While Construction Coo <br />Walk per sq. Ltd. <br />.20 <br />. Curb per lin ft. <br />.50 <br />Gradiner cu. yd. <br />1.05 <br />S. Asp9a t Trinidad per sq. yd. <br />3.18 <br />S. Asphalt 11exiekn oil per sq. yd. <br />2.98 <br />Asphaltic concrete Mexican oil per sq. yd. <br />2.63 <br />Asphaltic concrete Trinidad per sq. yd. <br />2.83 <br />8 inch conduit pipe per lin ft. <br />1.00 <br />Storwater inlets, each <br />13.00 <br />.Storm. Margina curb per lin ft. <br />.40 <br />Resetting islets, each <br />3.00 <br />Resetting manholes curbs and covers, each <br />3.00 <br />Check $711.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.