Laserfiche WebLink
Bid of White Construction Company <br />Walk per sq. ft. <br />$.20 <br />" Curb per lin ft. <br />.50 <br />Grading per cu. yd. <br />1.05 <br />Sheet Asphalt Trinidad per sq. yd. <br />3..18 <br />Sheet Asohalt Mexican per sq, yd. <br />2.98 <br />Asphaltic conere a Mexican per sq. yd. <br />2.63 <br />Asphaltic concrete Trinidad per sq. yd. <br />2.83 <br />8 inch conduit pipe per lin ft. £ <br />1.00 <br />" 5�0'rm'water inlets, each <br />13.00 <br />° MarginAl "curb per lin ft. <br />.40 <br />' Resetting inlets, each <br />3.00 <br />Resetting manholes coverit each <br />3.00 <br />" cheek S166.00 <br />Bid of Williston Construction Co. <br />Walk per sq. ft. <br />.20 <br />Curb per lin ft. <br />.60 <br />Grading per cu. yd. <br />1.00 <br />Sheet Asphalt Mexicaan. Asphalt pr sq. yd. <br />2.82 <br />y Sheet asphalt Trinidad asphalt per sq. yd.2.98 <br />" ophaltie "concrete Mexican per -sq. yd. <br />2.52 <br />" Asphaltic concrete Trinidad per sq. yq. <br />2.68 <br />8 ,ineh conduit pipe per lin ft. <br />.95 <br />" Storm water inlets, each <br />14.50 <br />Marginal curb pr lin ft. <br />.40 <br />Resetting 'inlets,. each. <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />Cheek $166.00 <br />PAVEMENT ON ALLEY WEST OF PRANKLIN STREET. <br />Bid of Hoban & Roach <br />7 inch concrete pavement per sq. yd. <br />$2.79 <br />grading per cu. yd. <br />1.50 <br />" Chuck 4100.00 <br />Bid of H. N. Barnes ' <br />Grading per cu. yd. <br />1.50 <br />Concrete pavement per sq. yd. <br />2.80 <br />_ Cheek $100.00 <br />PAVEMENT ON GOLDEN AVENUE. <br />Bid of Hoban & Roach. <br />Grading per cu. •yd. <br />7 inch condrdie per sq. yd. <br />8- inch conduit pipe -per lin ft. <br />Storm water inlets, each <br />Resetting inlets, each <br />Resetting manholes covers, each <br />Bid of Globe Construction Company <br />F <br />Cheek $193.00 <br />Grading per cu. yd. <br />Asphalt Trinidad per sq. yd. <br />Asphalt, lexies <br />Asphaltic concrete Mexician <br />Asphaltic concrete Trinidad <br />8 inch -conduit pipe per lin ft. <br />Marginal curb per lin ft. <br />Resetting inlets, each <br />Resetting manhole covers, each <br />Cheek 4193.00 <br />1.30 <br />2.75 <br />.80 <br />15.00 <br />3.50 <br />3.50 <br />1.15 <br />3.27 <br />3.04 <br />2.91 <br />2.72 <br />1.25 <br />.50 <br />5.00 <br />5.00 <br />