My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/1923 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1923
>
03/13/1923 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:59:10 PM
Creation date
9/5/2018 10:33:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/13/1923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
742 <br />Tdesday March 13th., 1923. Continued. <br />Bill of White Construction` Co. <br />Walk per sq. ft. <br />$.20 <br />cement curb perlin ft. <br />' .50 <br />Grading per 'cu. yd. <br />1.05 . <br />Sheet Asphalt Trinidad Lake per sq. yd. <br />3.18 <br />nn nn Mexican asphalt per sq. yd. <br />2.98 <br />Asphaltic concrete Mexican per sq. yd. <br />2.63 <br />Asphaltic concrete Trinidad 'per sq. yd. <br />2.83 <br />8ineh conduit pipe per lin ft. <br />1.00 <br />Stoem water inlets$ each <br />U-00 <br />Marginal curb per lin ft. <br />.40 <br />Resetting inlets, each +° <br />3,.00 <br />Resetting manholes curbs and covers, each <br />3.00 <br />Cheek $100.00 <br />Bid of Williston 'Construction Company. <br />Walk_ per sq. ;f&. <br />.20 <br />Curb per lin ft. <br />.60 <br />Grading per cu. yd. <br />1.00 <br />i Asphalt Mexican per sq. yd. <br />2.82 <br />Asphalt Trinidad lake per sq. yd. <br />.2.98 <br />Asphaltic concrete Mexican per sq. yd. <br />2.52 <br />Asphaltic concrete Trinidad per sq. yd. <br />2.68 <br />8 inch conduit, pipe per lin ft. <br />.95 <br />Storm water inlets, each <br />14.50 <br />Manholes pxxxR:tx reset each <br />3.00 <br />' Resetting inlets, eaeh <br />3.00 <br />Mrginal curb per lin ft. <br />.40 <br />4 Cheek $100.00 <br />PAVEMENT ON POLAND STREET. <br />Bid of Hoban & Roach A <br />Grading per cu. yd. 1.50 <br />7 inch conduit ,pipe per lin ft,. 2.75 <br />8 inch conduit.pipe per lin ft. .80 <br />Storm water inlets, each 15.00 <br />Resetting inlets, each 3.50 <br />Resetting manhole each 3.50 <br />$166.00 <br />Bid of Globe Construction Co: <br />Grading per cu. yd. 1.15 <br />Asphalt Nat. Lake Asphalt p or sq. yd. 3.27 <br />Asphalt Texicao Asphalt, per sq. yd. 3.o4 <br />Asphaltic cone. Trinidad.per sq. yd. 2.91 <br />Asphaltic concrete Texica• per sq. yd. 2.72 <br />8 inch conduit pipe per lin ft. 1.25 <br />Manhole covers reset, each <br />5.00 <br />Resetting'inl6ts, each. <br />5.00 <br />e Marginal curb per lin ft. <br />.50 <br />$166.00 <br />Bid of the Pikb Construction Company. <br />Grading per cu. yd. <br />1.05 <br />Sheet asphalt Trinidad Lake per sq. yd. <br />3.13 <br />Sheet asphalt Mtandard Mex. per sq. yd. <br />2.89 <br />' Asphaltic concrete Trinidad pr•sq. yd. <br />2.80 <br />Asphaltic concrete Standard Mexican, per <br />sq. yd $2.60 <br />Margihal curb per lin ft. <br />.35 <br />Resetting inlets, each <br />3.00 <br />' $ese'ttiag.manhole covers, each <br />3.00 <br />Cheek $166.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.