Laserfiche WebLink
n <br />Board met in regular session at 9:00 A.M. All members present. <br />O • A 3 <br />Mr. Horace Kemble and M.. Eaavaaanuagh representing the Studebaker <br />Corportion with D, C.-Layton Street Commissioner appeared before the Board and the <br />matter of plaeingg cinders on.E�ekman Street from Michigan Street. west was discussed <br />and it was agreed that anaagreement be drawn and presented to the Board for same. <br />Bids were areceived, opened and read as follows:- <br />P,TPE SEWER . ON EWING AVENUE.9 PROM 'MIAMI STREET TO CLYDE STREET. <br />Bid.' -of Staples, &' Acker x, <br />15 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />$2.70 <br />12 inch pipe' <br />sewer <br />per <br />lin <br />ft. <br />2.30 <br />10 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />1.90 <br />8 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />,go <br />b inch pipe <br />sewer <br />per <br />lin <br />ft,. <br />.1.00 <br />Manholes per <br />eft. <br />8.00 <br />Manholes, curbs <br />and covers, <br />each <br />18.00 <br />Storm water <br />inlets,, <br />each <br />10.00 <br />Check $100.00 <br />Bid of George Pontare,11i <br />1,5 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />3.15 <br />12 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />2.20 <br />10 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />2.10 <br />,8 inch pipe <br />sewer <br />per <br />lin <br />ft. <br />.70 <br />6 inch pipe, <br />sewer <br />per <br />lin <br />ft. <br />1.00 <br />Manholes per <br />ft. <br />7.00 <br />Manholes eurbs and covers, <br />each <br />18.00 <br />Storm water <br />inlets, each <br />9.00 <br />Check $100.00 <br />Bid of L. H. Webster <br />°15 inch pipe sewer per lin ft. <br />3,m1 <br />12 inch pipe sewer per lin ft. <br />2.80 <br />-10 inch pipe sewer per lin ft. <br />2.66 <br />8 inch pipe sewer per lin ft. <br />1.03 <br />. 6 inch pipe sewer per lin ft. <br />1.09 <br />,Manholes per ft. in depth <br />8.50 <br />Manholes curbs and covers, each <br />17.50 <br />Storm water inlets, each <br />10.00 <br />Check <br />4100. 00 <br />PIPE SEWER.ON UARPER COURT PAVEMENT. <br />Bid of Hoban & Roaeh, u <br />+ rading per cu. yd. <br />1,25 <br />inch concrete pavement per sq. <br />yd. <br />2.75 <br />8 inch conduit pipe per lin ft. <br />.80 <br />Aterm water inlets, each <br />15.00 <br />Reset inlets, each <br />3.50 <br />Resetting manholes each <br />'Cheek <br />3.50 <br />$100.00 <br />Bid of Globe Constru6tion Company <br />Grading• per, cu. yd'. 1.15 <br />Slkeet Asphalt Natural Lake Asp -halt per sq. yd 3.27 <br />"" Texaco Asphalt, per-sq__lyd. 3.04 <br />Asphaltic concrete Natural Lake Asphalt per sq. yd. 2.91 <br />Asphaltic concrete Texaco asphalt per sq. yd. 2.92 <br />Storm water inlets, each 15.00 <br />Marginal curb per ikin, ft. .50 <br />Resetting inlets, each 5.00 <br />Resetting manholes curbs and covers, each 5.00 <br />Cheek $100.00 <br />