Laserfiche WebLink
(18) Back-up generator—gas line: <br /> a. 10 Kv or less. 30.00 <br /> b. Over IOKv................ 50.00 <br /> Eachre-inspection.............................. ............................................................. 299 30.00 <br /> 20 Each additional final inspection.......................................................................... 30:0 60.00 <br /> (e) All plumbing installations requiring a permit shall be inspected by the plumbing <br /> inspector three (3) times, once each for underground work, rough-enin work, and final <br /> completion. A complete line test shall also be supervised by the plumbing inspector. The <br /> plumbing permit holder shall notify the plumbing inspector at least twenty-four (24) hours in <br /> advance of the time the work is ready for inspection. If the work does not pass inspection, a <br /> reinspection fee of twenty five deft H thirty dollars ($30,00) shall be charged for each future <br /> inspection of that stage of work. <br /> Section V. Chapter 6, Article 1, Section 6-24(c) of the South Bend Municipal Code be <br /> and hereby is amended to read as follows: <br /> (c) Fees. Each application for a permit for installation or alteration of electrical wiring or <br /> equipment shall be accompanied by fees in accordance with the schedule below; with a <br /> minimum permit fee of twenly dellafs ($20.00) thirty dollars ,$30.00): <br /> (1) Temporary service for construction: <br /> Allamperage............................................................$ 7.00 <br /> (2)Switchboards and panel boards each, new and <br /> replaced.' <br /> 60-amp......................................................................$ 7.00 <br /> 100-amp.................................................................... 9.00 <br /> 200-amp.................................................................... 12.00 <br /> 400-amp,,................................... .......... ................... 15.00 <br /> 600-amp.................................................................... 20.00 <br /> Over 600-amp to 2,000 amp..................................... 25.00 <br /> Over2,000 amp......................................................... 50.00 <br /> (3) Circuits (new or replaced): <br /> a. Each circuit........................................................... 5.00 <br /> (4)Horsepower (machinery): <br /> a. First hp.................................................................. 7.00 <br /> b. Each additional hp................................................ 0.25 <br /> (5) Back-up generator: <br /> a. 10 Kv or less. 30.00 <br /> b. Over 10 Kv. 50.00 <br /> (5)(6) Pool wiring and/or bonding..................................20.0 30.00 <br /> (6)(7) Repair, extension, and/or maintenance of wiring.... ....2499 30.00 <br /> (-7)(8) Reset, relocation, reconnect fees, each........................... 200 30.00 <br /> (4(9)Each re-inspection fee......................................................5-09 30.00 <br /> (9)-LUO Each additional final inspection......................................50A9 60.00 <br /> 8 <br />