Laserfiche WebLink
b. Over 1,500 CFM capacity.................................................. 60.00 120.00 <br /> Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: <br /> a. I to 5 horsepower, each........................................................45-00 17.00 <br /> b. 6 to 10 horsepower, each......................................................2500 30.00 <br /> c. More than 10 horsepower, each............................................40.00 45.00 <br /> L9,) Rooftop combination furnace and air conditioning units, 60,000 to 300,000 Btu's, <br /> each: <br /> a. Up to 7 %2 tons.................................................................... 40.00 45.00 <br /> b. 7 /2 tons or more........................................... ................... 60.-00 70.00 <br /> IUO)Heat pumps: <br /> a. 1,000 to 60,000 Btu's input.................................... 2:0.00 30.00 <br /> b. 60,000 to 300,000 Btu's: <br /> 1. Up to 7V2 tons, each.................................................40.0 45.00 <br /> 2. 71/2 tons or more, each..............................................2590 85.00 <br /> c. Earth, coupled water source...................................................50.09 60.00 <br /> LUI Boilers, steam or hot water: <br /> a. Up to 300,000 Btu's............................................. 20.00 30.00 <br /> b. 300,000 Btu's or more..........................................................50.00 60.00 <br /> Through-wall combination air conditioning/heating and VAV boxes w/coil: <br /> a. First unit................................................................................29-00 30.00 <br /> b. Each additional unit..............................................................10.00 12.00 <br /> c. Solar heat units..................................................................... 50.0 60.00 <br /> Air handlers <br /> a. 400 CFM to 2,500 CFM........................................................2590 30.00 <br /> b. Over 2,500 CFM....................................................................60.00 70.00 <br /> (.14) Back-pX,generators - gas line: <br /> a. 10 Kv or less. 30.00 <br /> b. Over IO Kv........................................................... 50.00 <br /> Duct and register: <br /> a. first 15 openings, per s stem.. 30.00 <br /> b. Each opening thereafter er system.. 1.00 <br /> 16 Gas reconnection, each....................................................................... 29 00 30.00 <br /> 17 Gas piping (distribution of piping to equipment) to be included on permit <br /> application <br /> Each gas piping system, per outlet.......................................... 2.W 3.00 <br /> Woodburning stoves, per flue (including chimney and chimney <br /> connector)..................................................................... 20.00 30.00 <br /> (19) Each reinspection fee............................................................................2500 30.00 <br /> (20) Each additional final inspection............................................................50.09 60.00 <br /> 10 <br />