My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-11 Council Agenda & Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2011
>
12-12-11 Council Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2011 3:07:02 PM
Creation date
12/8/2011 3:00:21 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section III. Chapter 6, Article 1, Section 6-6.4(c) of the South Bend Municipal Code be <br /> and hereby is amended to read as follows: <br /> (c) All installations of wood burning stoves shall be inspected by the Department two (2) <br /> times, one (1) each for preliminary venting work and for final, completed installation. <br /> The permit holder shall notify the Department at least twenty-four (24) hours in <br /> advance of the time the work is ready for inspection. If the work does not pass <br /> inspection, a reinspection fee of twenty five dafla.s (W nn` thirty dollars ($30.00_ <br /> shall be charged for each future inspection of that stage of work. <br /> Section IV: Chapter 6, Article 1, Section 6-10, subparts (c) and (e) of the South Bend <br /> Municipal Code be and hereby are amended to read as follows: <br /> (c) Schedule of permit fees. Permits issued for plumbing work within the City shall be <br /> subject to the following fee schedule, with a minimum permit fee being twenty dallar-s ($20.00) <br /> thirty dollars ($30.00). <br /> Each plumbing fixture or trap or set of fixtures on one trap, including water <br /> and drainage piping therefore........................................................ 5-.-00 6.00 <br /> M Each backflow protection...................................................................................... 5-.-GO 6.00 <br /> Each building sewer: <br /> a. Under 100'..................................................................................................... 10.00 12.00 <br /> b. 100' or over.................................................................................................... 200 25.00 <br /> Each building water: <br /> a. Under 100'..................................................................................................... 10.00 12.00 <br /> b. 100' or over................................................................................................... 20.0 25.00 <br /> Eachwater softener.............................................................................................. 6-.W 7.00 <br /> Each trailer park sewer......................................................................................... 9790 10.00 <br /> Each drain within building for rainwater systems................................................ 560 6.00 <br /> L8,) Each water beater and/or vent............................................................................... 6,00 7.00 <br /> nEach gas reconnect ion............................................................................................ 20.00 30.00 <br /> Each gas piping system, per outlet.......................................................................... 2-.00 3.00 <br /> (11)Each industrial waste pretreatment interception, including its trap and vent, <br /> excepting kitchen-type grease interceptors functioning as fixture traps........... X00 8.00 <br /> 12 installation, alteration or repair of water piping and/or water treating equipment.. 5:00 6.00 <br /> Repair or alteration of drainage or vent piping. ..................................................... 5-.�00 6.00 <br /> 14 Each drywell.........................................................................................................._1000 12.00 <br /> 15 Each lawn sprinkler system on any one (1) meter, including backflow <br /> protection devices thereof.................................................................................... X80 6.00 <br /> Fire protection sprinkler system: <br /> a. Up to 30 heads...............................................................................................2460 30.00 <br /> b. Plus each additional 10 heads thereafter .................................................. 7:00 8.00 <br /> 17 Gas tanks and pumps...............................................................................................10.00 12.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.