My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec S - One or More 2018 or Newer Emergency Medical Vehicle - Crossroads Ambulance Sales & Service LLC - Part 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec S - One or More 2018 or Newer Emergency Medical Vehicle - Crossroads Ambulance Sales & Service LLC - Part 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:48:54 AM
Creation date
8/30/2018 9:09:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2019 International MV/PL Custom Titan 170 <br />Type I Ambulance Proposal Specification <br />10. All edges of the module body, doors, and door openings are to be rounded for maximum paint mils. <br />11. All body work requires a Quality Assurance inspection to check for pin holes, gaps, scratches, and blemishes. All <br />edges are to be rounded, and all sealant is to be sanded before epoxy primer application. <br />Ill. Surface Preparation --- Brightener Process <br />1 , Fully rinse module with D.I. water. <br />2. Mix 35 Oz. Brightener to 500 oz D.I. water. <br />3. Apply Brightener solution from the top of the module working down while scrubbing with a brush to insure <br />complete surface contact and mechanical cleaning. <br />4. Allow approximately 5 minutes dwell time on the surface, <br />5. Rinse thoroughly with D.I. water. Water must "sheet" cleanly over the aluminum surface. If required, repeat <br />process. <br />IV. Surface Preparation --- Application of Gardobond <br />4707 <br />1. Mix 300 milliliters of Gardobond 4707 to 2 gallons of D.I. water. <br />2. Apply Gardobond solution starting at the top of the module and working down using approved spray equipment <br />while maintaining at least 50 % overlap application process. <br />3. Allow 5 minute dwell time on the surface. <br />4. Rinse thoroughly with D.I. water, <br />5. Blow off excess water with air blower concentrating on recessed areas and seams. <br />6. Blow off and bake dry in spray booth (140 degrees for 46 minutes), and recheck for residual water. <br />7. Tack and proceed with painting process. <br />V. Door Preparation <br />1, Follow same procedures as for exterior module body preparation. <br />2. Inner doors must be coated in designated areas with "cavity wax" after finish process has been completed. <br />V1. Surface Preparation for Small Repalirs <br />1, Surface clean substrate utilizing Sikkens OTO surface cleaner as per recommended process. <br />2. Prepare surface using aluminum P-180 grit DAor 3MO774 Red scuff pads. <br />3. Final surface clean with Sikkens OTO Surface Cleaner as per recommended process. <br />A4539-0001 08/24/18 <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.