Laserfiche WebLink
Scope of Work and Cost Proposal for Beck's Lake NPLILaSalle Park Area <br />August 6, 2018 <br />Page 2 of 8 <br />Task 2 - Downgradient Offsite Monitor Well Installation and Sampling: <br />The purpose of this activity is to determine the downgradient extent of groundwater <br />impacts (exceeding established maximum contaminant levels [MCLs]) identified along the <br />northern property boundary of the LaSalle Park property per EPA requirements. Prior to <br />initiating the scope provided in Task 1 and Task 2, a plan must be finalized and <br />incorporated into a Work Plan Addendum required under Administrative Settlement <br />Agreement and Order on Consent (ASAOC) Amendment 2, which is subject to EPA <br />approval. <br />Should no waste fill material be observed during the offsite waste fill delineation, a total <br />of eight monitor wells (including five shallow wells and three deep wells) will be installed <br />in the right-of-way along the north side of Linden Avenue across from LaSalle Park as <br />required by EPA. Each monitor well will be installed with a truck -mounted hollow -stem <br />auger drilling rig. Each well will be constructed of 2-inch diameter PVC casing and screen <br />(0.010-inch slot — five-foot length for deep wells and 10-foot length for shallow wells). The <br />shallow wells will be set to straddle the upper water table which is typically encountered <br />between 5 feet and 10 feet below grade level (bgl). The deep wells will be set with the <br />well screens set at intervals similar to that of the nearest onsite deep wells. The total <br />depth of the nearest deep well is between 35 feet and 40 feet bgl. Up to three soil samples <br />from each monitor well boring will be collected for laboratory analysis. Proposed monitor <br />well locations are depicted on Figure 1. <br />As required following monitor well installation and development, each monitor well will be <br />surveyed for location and elevation by an Indiana licensed land surveyor. Groundwater <br />levels will be gauged from each new monitor well, as well as, all existing monitor wells <br />prior to groundwater sampling. Groundwater samples will be collected from each of the <br />new monitor wells for laboratory analysis. <br />Soil boring advancement, soil sampling, monitor well installation, completion, <br />development, and groundwater sampling will be performed in accordance with the EPA - <br />approved Field Sampling Plan (FSP). <br />