Laserfiche WebLink
,JONES PETIRIE RAFwsw Exhibit A <br />Veritas, LLC. August 6, 2018 <br />30845 Rockinghorse Lane <br />Niles, MI 491120 <br />Attn: Richard T. Brown <br />President <br />RE: SCOPE OF WORK AND COST PROPOSAL, BECK'S LAKE NPIL SITE/LASALLE <br />PARK AREA, SOUTH BEND, INDIANA <br />(PROPOSAL #JPRE18-092) <br />Dear Mr. Brown,: <br />Jones Petrie Rafinski Corp. (JPR) is pleased to submit this Scope of Work (SOW) and Cost <br />Proposal for additional offsite waste delineation and groundwater investigation as requested by <br />the United States Environmental Protection Agency (EPA). The scope for both Task 1 and Task <br />2 are based on EPA requirements and this SOW also includes support services for continuation <br />of the existing Soil Management Plan (SMP), including up to 800 tons of excavated soil for <br />disposal and implementation of the SMP Addendum, (pending EPA approval) for planned <br />construction activities across the LaSalle Park Area. Costs to assist the Project Coordinator in <br />completing various other project related tasks (currently in progress) are also included. <br />PROPOSED SCOPE OF SERVICES <br />A conceptual SOW for each of these areas is addressed as follows: <br />TASK 1 - Additional Ofisite Waste Delineation: <br />The purpose of this activity is to determine if offsite waste fill material is present north of <br />LaSalle Park, Per EPA requirements, approximately 12 soil borings are planned on the <br />north side of Linden Avenue (see Figure 1). The soil borings will be located within the <br />right-of-way which extends 40 feet from the centerline of Linden Avenue. Each soil boring <br />will be advanced with a direct -push drilling rig. Soil samples will be logged for visual, <br />textural and olfactory characteristics by a geologist. No samples are planned: to be <br />collected for laboratory analytical testing since the presence of waste fill material can be <br />determined visually. However, the field sampling team will be prepared to collect soil <br />samples for analytical testing should something unexpected be observed and costs for <br />such are included in this task as a contingency. If waste fill material is found within the <br />entire right-of-way on the north, side of Linden Avenue, the investigation will halt. 'The <br />intent is to not install monitor wells through areas of waste fill. If the right-of-way is <br />determined to be comprised of partial waste fill material and it is possible to install monitor <br />wells outside of the waste fill area but still within the right-of-way, the monitor well <br />installation will proceed. <br />Architecture . Engineering , Environmental GIS , Landscape Architecture . Planning <br />Rene,Nable Energy W.J, Land Surveying . Utility Management <br />1988, CELEBRATING, 201 B <br />200 Mbco Fkwy j[W I32!' S 1.afayk,,w:,- Blvd 108 W, colon"1.4.t St <br />SQLM_�?XCAO Suite 200 S(Zilh Bund 1i,4 46601 FM Wayw., IM 46802 <br />yc,w oo,ooqfi-, 1111117Q EH+iart IN 46516 574.232.4388 574.422Z22 <br />574.293.7762 <br />