My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 Performance Based Budget
sbend
>
Public
>
Finance
>
Budgets
>
2004
>
2004 Performance Based Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2014 10:58:01 AM
Creation date
12/18/2007 12:09:28 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAJOR CAPITAL PROJECT DESCRIPTION <br />FOR YEARS 2005 - 2008 <br />Proiected On oing Operating Cost Impact <br />Lane widening will be done, but no new traffic lanes will be constructed. New pavement and <br />separated drainage system will reduce overall operating and maintenance costs. <br />Ewing Avenue Improvements $5,300,000 (2005-2006) <br />Ewing Avenue pavement has deteriorated and is in need ofreplacement, improved drainage facilities <br />and intersection improvements. <br />Funding Source <br />Activi , Date LRSA, Federal <br />2005 $ 300,000 -LRSA <br />2006 5,000,000 -LRSA, Federal <br />TOTAL $5,300,000 <br />Proiected On oing_Operatin~ Cost Impact <br />Lane widening will be done, but no new traffic lanes will be constructed. New pavement and <br />separated drainage system will reduce overall operating and maintenance costs <br />South Side Economic Development Area $2,000,000 (2005) <br />The rejuvenation of South Side retail growth will require substantial investment in infrastructure to <br />benefit those prof ects. Annual expenditures can be expected for the next three years. Improvement <br />and expansion of Ireland Road is expected to be among the developer-generated demands. This will <br />include improvements to the drainage systems. Improvements shall be financed with TIF and STIF <br />revenue. <br />Funding Source <br />Activity Date TIF, STIF <br />2005 $2,000,000 - TIF, STIF <br />TOTAL $2,000,000 <br />Projected Ongoing_Operatin~ Cost Impact <br />Lane widening will be done, but no new traffic lanes will be constructed. New pavement and <br />separated drainage system will reduce overall operating and maintenance costs <br />COMMUNITY AND ECONOMIC DEVELOPMENT <br />Neighborhood Partnership Center Public Works $2,000,000 (2005-2008) <br />This project consists of small-scale neighborhood public improvements (i.e., curbs, sidewalks, <br />D-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.