My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 Performance Based Budget
sbend
>
Public
>
Finance
>
Budgets
>
2004
>
2004 Performance Based Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2014 10:58:01 AM
Creation date
12/18/2007 12:09:28 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
It is important to note that any operating costs associated with these new capital improvements <br />have either been specifically included in the 2004 Operating Budget or can be absorbed by the <br />current budget if specific allocations were not made at the time the operating budget was <br />prepared. If debt issuance was deemed necessary to fund any capital expenditures, the impact of <br />this debt on current and future operations was considered before including this capital project in <br />the current capital budget. <br />The 2004 Capital Budget represents the first year of the City's five year Capital Improvement <br />Plan (CIP). The budget identifies the source of funding for each expenditure. The first two pages <br />that follow this introduction summarize, by funding source, the cash available (after reserves) for <br />capital projects as described earlier. The remaining portion of the 2004 Capital Budget <br />document details all expenditures approved by the Council. Consistent with the City's general <br />financing policy, all capital expenditures included in the 2004 Capital Budget will be funded~on <br />a "pay as you go" basis. <br />Following that information is the remainder of the City's Five Year Capital Improvement Plan <br />through the year 2008. The projected capital expenditures for the years 2005 through 2008 have <br />been divided into five categories: vehicle replacement/upgrade program; computer, office and <br />other operational equipment; routine/minor capital expenditures; ongoing infrastructure <br />expenditures; and major capital expenditures. These expenditures have been further broken <br />down on this schedule by the City Department requesting the capital expenditure and the <br />potential funding source for these future expenses (which would include the General Fund and <br />various other citywide capital funds, Special Revenue Funds and Enterprise Funds). <br />It is anticipated that four of the five categories mentioned above (excluding the major capital <br />expenditure category) would be funded on a "pay as you go" basis with a few exceptions. This <br />is consistent with the City's current funding policies. The vehicle replacement/upgrade program <br />represents the systematic upgrading andlor scheduled replacement for the City's existing fleet of <br />cars, trucks and specialized vehicles. The Fire Department and the Police Department vehicles <br />are currently on a financing schedule that would allow the City to continue to finance the <br />replacement of these vehicles if necessary. The computer, office and other operational <br />equipment expenditures represent routine costs anticipated to either maintain or enhance current <br />operations with minimal or no additional operational costs associated with these expenditures. <br />The same is true with the routine (minor) capital expenditures. These minor capital costs (i.e., <br />building and equipment repairs, minor remodeling costs, park property enhancements, etc.) <br />represent ongoing costs incurred in daily operations and would not have an additional impact on <br />the annual operating budget once included in the capital budget. The ongoing infrastructure <br />expenditures included in the City's Five Year CIP represents the current levels incurred for such <br />expenditures. These expenses also are anticipated to be funded on a "pay as you go" basis and <br />represent the systematic upgrading of the City's infrastructure. <br />The major capital expenditure category is further detailed by project on a separate report <br />following the summary of the City's overall CIP. Included with this summary is the anticipated <br />funding source for each major project. Following this summary is a detailed description of each <br />major project, the features and benefits anticipated by the expenditure and the impact the capital <br />project may have on the City's ongoing operational expenditures. Several of these major <br />projects will be dependent upon partnerships with outside organizations. When this is the case, <br />timing of the project implementation will be subject to available funding. Resources needed for <br />D-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.