Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting -February 3, 2006 <br />4. COMMUNICATIONS <br />() continued... <br />SU1~I1l~ARY OF FIRE ARTS IHPROVEI~IENTS <br />State of the PAC Building when Fire Arts first got <br />use of the building in June 2004 compared with <br />the state of the building now, in January 2006 <br />THE1V June 2004 <br />Large holes in the roof, allowing rain to pour in <br />Gas lines had numerous leaks <br />Gas furnaces not functioning <br />Hot water heaters not functioning; unable to be <br />fixed <br />Plumbing not useable <br />Drains were clogged <br />Air conditioning didn't work <br />Glass front windows were broken <br />No handicap accessible toilet <br />Outside lights in front not functioning; unable to <br />be fixed <br />Outside light in parking aNea not functioning <br />Front and side door locks didn't work from the <br />inside <br />Ti~~o broken metal gates along Sycamore <br />Ugly garage doors on Sycamore <br />Minimal electrical service <br />No gas to kiln room <br />Inadequate venting from kiln room <br />Each room was filled with trash and abandoned <br />furniture <br />Rugs were badly stained and unusable <br />Wallboard was peeling off the temporary walls <br />Graffiti, signs, posters; banners left on all walls <br />Debris, bottles, broken glass, high weeds outside <br />Old PAC sign still up <br />Grass not mowed; weeds obstructed view of back <br />neighbor <br />14 <br />