Laserfiche WebLink
South Bend Redevelopment Commission <br />Regular Meeting -February 3, 2006 <br />4. COMMUNICATIONS <br />() continued... <br />NOW January 2006 <br />Roof is sound <br />Repaired & upgraded gas lines <br />Repaired or replaced gas furnaces <br />Purchased 2 new hot water heaters <br />Replaced water pipes <br />Cleaned out drains <br />Repaired air conditioner <br />Repaired and colorfully painted glass front <br />windows <br />Constructed and decorated handicap accessible <br />toilet <br />Replaced outside lights with new <br />Added lighted roof sculpture <br />Repaired outside light in parking area <br />Replaced front & side door locks and added <br />alarms <br />Repaired one metal gate along Sycamore <br />Painted garage doors gNaphically <br />Upgraded electrical seNVice <br />Added gas service to kiln Noom <br />Installed kiln vent and upgraded existing fan <br />Cleared out trash and abandoned furniture <br />Removed carpeting and painted floor <br />Removed damaged walls <br />Cleaned and painted walls <br />Cleared away debris outside <br />Removed PAC sign; added sculpture <br />Cleared and maintained grass <br />Equipment, tools & furniture donated or loaned <br />included complete: <br />Woodworking area <br />Wax working area <br />Modeling area <br />Mold making area <br />Plaster investment area <br />Stone carving area <br />15 <br />