My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-03 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2003
>
04-17-03 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:22:55 PM
Creation date
8/2/2011 3:25:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —April 17, 2003 <br />6. NEW BUSINESS (CONT.) <br />A. South Bend Central Development Area <br />(continued...) <br />(2) Commission approval requested for <br />proposal for maintenance services in the <br />South Bend Central Development Area. <br />(St. Joseph /Jefferson Street Garage) <br />Mr. Williams reported on a potentially <br />hazardous situation at the St. <br />Joseph/Jefferson Street Garage located on <br />the corner of St. Joseph Street and Jefferson <br />Boulevard. After a routine inspection, <br />AMPCO detected a hole in the floor of the <br />sixth level decking which has penetrated to <br />the deck below. The hole is located on the <br />ramp area and the realm of decay is much <br />larger on the underside. This area was <br />blocked off immediately and remains <br />blocked off. Paul Fujawa Engineering has <br />inspected and marked the area in need of <br />repair. Kaser - Spraker Construction, a <br />company specializing in this type of repair <br />work, has been contacted to perform the <br />repair. The estimate received totaled <br />approximately $27,000 with a two week <br />time frame. Levels four through six on the <br />north end of the garage will be closed during <br />the maintenance period and traffic will be <br />re- routed. Staff recommends prompt action <br />on the repair and accepting the proposal <br />from Kaser - Spraker. <br />Upon a motion by Ms. Jones, seconded by <br />Mr. Kahn and unanimously carried, the <br />Commission approved the request for <br />professional services in the South Bend <br />Central Development Area and authorized <br />IL staff to retain Kaser - Spraker based on the <br />scope of services and fee proposed. <br />(St. Joseph/Jefferson Street Garage) <br />4 <br />COMMISSION APPROVED THE REQUEST FOR <br />PROFESSIONAL SERVICES IN THE SOUTH BEND <br />CENTRAL DEVELOPMENT AREA AND <br />AUTHORIZED STAFF TO RETAIN KASER- SPRAKER <br />BASED ON THE SCOPE OF SERVICES AND FEE <br />PROPOSED. (ST. JOSEPH/JEFFERSON STREET <br />GARAGE) <br />
The URL can be used to link to this page
Your browser does not support the video tag.