My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-03 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2003
>
06-06-03 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:21:54 PM
Creation date
8/2/2011 3:21:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. 1 4 r <br />South Bend Redevelopment Commission <br />Regular Meeting —June 6, 2003 <br />6. NEW BUSINESS <br />C. Sample -Ewing Development Area <br />(1) continued.... <br />east elevation wall just south of the <br />smokestack. <br />• Abatement or covering of lead based <br />paint on the exterior of the building. <br />• Enclosing of south doorway on east <br />elevation. Exterior finish will be <br />matching brick, while interior shall <br />be C.M.U. enclosure. <br />• Enclosure of overhead door on south <br />elevation, and installation of a new <br />set of double doors installed in an <br />eight foot by eight foot doorway. <br />Exterior finish will be matching <br />brick, while interior shall be C.M.U. <br />enclosure. <br />• Preparation of a topographic survey <br />of the property based on a fifty (50) <br />foot grid. <br />► Rose Fuel & Materials, Inc. will assume <br />the following obligations: <br />• Invest a minimum of $1,200,000 in <br />the boilerhouse property. <br />• Construct all interior build -out and <br />finishes including the showroom and <br />office concept as presented in the bid <br />submitted May 2, 2003. <br />• Site improvements are to include <br />landscaping and screening. <br />• Conduct any cleaning and painting of <br />interior masonry or steel surfaces. <br />• Installation of new entry door <br />systems on north and south <br />elevations of the boilerhouse. <br />• Construction of any basement <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.