Laserfiche WebLink
1. 1 4 r <br />South Bend Redevelopment Commission <br />Regular Meeting —June 6, 2003 <br />6. NEW BUSINESS <br />C. Sample -Ewing Development Area <br />(1) continued.... <br />east elevation wall just south of the <br />smokestack. <br />• Abatement or covering of lead based <br />paint on the exterior of the building. <br />• Enclosing of south doorway on east <br />elevation. Exterior finish will be <br />matching brick, while interior shall <br />be C.M.U. enclosure. <br />• Enclosure of overhead door on south <br />elevation, and installation of a new <br />set of double doors installed in an <br />eight foot by eight foot doorway. <br />Exterior finish will be matching <br />brick, while interior shall be C.M.U. <br />enclosure. <br />• Preparation of a topographic survey <br />of the property based on a fifty (50) <br />foot grid. <br />► Rose Fuel & Materials, Inc. will assume <br />the following obligations: <br />• Invest a minimum of $1,200,000 in <br />the boilerhouse property. <br />• Construct all interior build -out and <br />finishes including the showroom and <br />office concept as presented in the bid <br />submitted May 2, 2003. <br />• Site improvements are to include <br />landscaping and screening. <br />• Conduct any cleaning and painting of <br />interior masonry or steel surfaces. <br />• Installation of new entry door <br />systems on north and south <br />elevations of the boilerhouse. <br />• Construction of any basement <br />29 <br />