My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-03 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2003
>
06-06-03 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:21:54 PM
Creation date
8/2/2011 3:21:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —June 6, 2003 <br />6. NEW BUSINESS <br />C. Sample -Ewing Development Area <br />(1) continued.... <br />from all masonry walls inside and out), and <br />cleaning of exterior brick. (The east <br />elevation lead -based paint surfaces still need <br />to be resolved.) <br />• Stabilization and repair of the <br />smokestack. This will include <br />removal of the unstable uppermost <br />portion of the smokestack. <br />Additional material will be added <br />back to the smokestack in order to <br />bring it to the approximate as -built <br />height and will return the "O" to <br />"OLIVER" which is on the north <br />northeast elevation of the stack. <br />• Windows (including main level and <br />clerestory) will be replaced, with a <br />maximum contribution of $255,000. <br />The clerestory will have a Sky -Wall <br />or approved equivalent installed, <br />while the main floor windows will be <br />non - reflective tinted insulated glass. <br />• Extension of water and sewer to the <br />property line. <br />• Construction of a roadway from <br />Chapin Street that will allow <br />permanent access to the site. This <br />roadway will be a dedicated street <br />and will serve as an access point to <br />all other parcels in the Oliver <br />Industrial Park. <br />• Grading of the site, including <br />capping of the former coal dump and <br />filling of the pit that straddles the <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.