My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-03 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2003
>
06-06-03 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:21:54 PM
Creation date
8/2/2011 3:21:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —June 6, 2003 <br />6. NEW BUSINESS <br />C. Sample -Ewing Development Area <br />(1) continued.... <br />► The maintenance building has been <br />turned 90 degrees and is now located at <br />the south end of the site. <br />► The Commission will assume the <br />following obligations: <br />• Interior demolition of fixtures within <br />the boilerhouse. All boilers, <br />conveyors, catwalks, non - structural <br />framing and coal hoppers will be <br />removed. <br />• The floor will be rough leveled, <br />repaired, and concrete pads removed. <br />• All interior floor penetrations will be <br />IL in- filled— including all of those to <br />the basement. No interior access to <br />the basement will remain. <br />• The existing built -up roof membrane <br />will be removed down to the existing <br />roof deck. The roof deck will be <br />repaired/ replaced as necessary and a <br />new membrane roof will be installed. <br />Drain lines will be inspected and <br />repaired/replaced as necessary to <br />make them operational. <br />• Masonry repair will be done as <br />necessary. This will include tuck <br />pointing of mortar joints, rebuilding <br />of certain parapet sections, brick <br />replacement as needed, applying of <br />mortar wash on top of corbelled <br />brick, repair and replacement of <br />concrete accents, removal of metal <br />embedment (including the coal chute <br />and Building 14 attachment hardware <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.