Laserfiche WebLink
(c)Fees. Each application for a permit for installation or alteration of electrical wiring or <br /> equipment shall be accompanied by fees in accordance with the schedule below; with a <br /> minimum permit fee of jhLrty dollars($30.00): <br /> (1) Temporary service for construction: <br /> Allamperage............................................................$ 7.00 <br /> (2)Switchboards and panel boards each, new and <br /> replaced: <br /> 60-amp......................................................................$ 7.00 <br /> 100-amp.................................................................... 9.00 <br /> 200-amp.................................................................... 12.00 <br /> 400-amp.................................................................... 15.00 <br /> 600-amp.................................................................... 20.00 <br /> Over 600-amp to 2,000 amp..................................... 25.00 <br /> Over2,000 amp.:...................................................... 50.00 <br /> (3) Circuits (new or replaced): <br /> a. Each circuit........................................................... 5.00 <br /> (4)Horsepower (machinery): <br /> a. First hp...................................................I..........."1 7.00 <br /> b. Each additional hp................................................ 0.25 <br /> (5)Back-up generator: <br /> a. 10 Kv or less. 30.00 <br /> b. Over 10 Kv. 50.00 <br /> (5)(6)Pool wiring andlor bonding..................................20.09 30.00 <br /> (6)(7)Repair, extension, andlor maintenance of wiring....,....20.00 30.00 <br /> (7)(8)Reset, relocation, reconnect fees, each........................... 20-40 30.00 <br /> (4)(9)Each re-inspection fee......................................................2-5:00 30.00 <br /> (9)- l0 Each additional final inspection......................................50.0 60.00 <br /> If the exact number of circuits or horsepower is unknown at the time of the application <br /> for a permit, a permit may be taken for the minimum amount known with new permits issued as <br /> the extent of the work is known. <br /> Section VI. Chapter 6, Article 1, Section 6-25(a) of the South Bend Municipal Code be <br /> and hereby is amended to read as follows: <br /> (a) All electrical wiring and equipment installations and alterations requiring a permit <br /> shall be inspected by the Electrical Inspector. The permit holder shall notify the Electrical <br /> Inspector at least twenty-four (24) hours in advance of the time the work is ready for inspection. <br /> If the work does not pass inspection, a reinspection fee of thirty <br /> dollars ($30.00) shall be charged for each future inspection of that stage of work. <br /> Section VII. Chapter 6, Article 1, Section 6-36.3(c) of the South Bend Municipal Code <br /> be and hereby is amended to read as follows: <br /> (c) Fees. Each application for a permit for installation of heating, ventilating, air <br /> conditioning, and refrigeration equipment or systems shall be accompanied by fees in accordance <br /> 8 <br />