Laserfiche WebLink
with the schedule below, with a minimum permit fee being thirty dollars <br /> 30.00 . When the total capacity of any system in any single installation is provided by more <br /> than one (1) unit, the sum of the capacities of each unit and the total number of such units shall <br /> determine the fee. <br /> �} Space heaters, each 30,000 Btu input or more........................... ... 29:89-30.00 <br /> Q Warm-air furnaces, unit heaters, cabinet heaters, and radiant tube heaters: <br /> L. Up to 300,000 Btu..................................................... 20.00 30.00 <br /> b. 300,000 Btu input or more........................................................... 30.08 40.00 <br /> Oil and gas conversions: <br /> a. Up to 300,000 Btu input................................................ 20.00 30.00 <br /> IL. 300,000 Btu input or more............................................................ 39.08 40.00 <br /> Electric furnaces (air handling): <br /> A. Less than 100 kw input.................................................. 20.00 30.00 <br /> b. 100 kw input or more.................................................................... X90 40.00 <br /> LQ Air Conditioning: <br /> a. Central, electric: <br /> 1. Less than 5 tons..................................................... 20..09 30.00 <br /> 2. 5 to 10 tons.................................................................................30.00 40.00 <br /> 3. Over 10 tons...............................................................................550.00 60.00 <br /> b. Water chill ers..................................................................................x.0 85.00 <br /> c. EMI-air blower................................................................................24M 30.00 <br /> 0 Ventilating and exhaust systems: <br /> a. Less than 500 CFM capacity.................................................588 6.00 <br /> b. 500 to 1,500 CFM capacity..................................................10.00 12.00 <br /> (Plus 1.00 for each 500 CFM or fraction thereof in excess of 1,500 CFM) <br /> (7} Ventilating commercial hoods• including make up air: <br /> a. 500 CFM to 1,500 CFM capacity.........................................39:90 60.00 <br /> b. Over 1,500 CFM capacity.................................................. 60.00 120.00 <br /> 0 Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: <br /> a. 1 to 5 horsepower, each........................................................445M 17.00 <br /> b. 6 to 10 horsepower, each......................................................25.00 30.00 <br /> c. More than 10 horsepower, each............................................40.04 45.00 <br /> 0 Rooftop combination furnace and air conditioning units, 60,000 to 300,000 Btu's, <br /> each: <br /> a. Up to 7 '/2 tons.................................................................... 4440 45.00 <br /> b. 7 %tons or more................................................................ 60:49 70.00 <br /> fUO Heat pumps: <br /> a. 1,000 to 60,000 Btu's input.................................... 20;00 30.00 <br /> b. 60,000 to 300,000 Btu's: <br /> 1. Up to 7 1/Z tons, each.................................................40.00 45.00 <br /> 2. 7 %tons or more, each..............................................75.49 85.00 <br /> c. Earth, coupled water source...................................................50:80 60.00 <br /> 11 Boilers, steam or hot water: <br /> a. Up to 300,000 Btu's............................................. 20:98 30.00 <br />