Laserfiche WebLink
and drainage piping therefore........................................................ 3:09 6.00 <br /> L23 Each backflow protection................................................... ..... x:80 6.00 <br /> Each building sewer: <br /> a. Under 100'.................................................................................... ............ 10.00 12.00 <br /> b. 100' or over................................................................................. ............ 20.00 25.00 <br /> Each building water: <br /> a. Under 100'..................................................................................... <br /> ................ .1-8:99 12.00 <br /> b. 100' or over................................................................................ . 20.00 <br /> . ................. 25.00 <br /> LQEach water softener......................................................................... . 6,00 <br /> Each trailer park sewer.............................................................. 7.00 <br /> Each drain within � 10.00 <br /> ........... <br /> building for rainwater systems................................................ S-.w 6.00 <br /> Each water heater and/or vent.......................................................... . 6:89 7.00 <br /> Each gas reconnection........................................................................................... 20.0 30 <br /> 10 Each gas piping system, per outlet......................................................................... 2-00 .00 <br /> ............. 3.00 <br /> 11 Each industrial waste pretreatment interception, including its trap and vent, <br /> excepting kitchen-type grease interceptors functioning as fixture traps........... 7:00 8.00 <br /> LU2 Installation, alteration or repair of water piping and/or water treating equipment.. 3:99 6,00 <br /> 13 Repair or alteration of drainage or vent piping....................................................... 6.00 <br /> Each drywell........................... ...................................................................... 10,00 12.00 <br /> .......... .............. <br /> 1 S Each lawn sprinkler system on any one (1)meter, including backflow <br /> protection devices thereof................................................................................... &.90 6.00 <br /> Fire protection sprinkler system: <br /> a. Up to 30 heads.................................................................................... .20:89 30.00 <br /> b. Plus each additional 10 heads thereafter 7, $.00 <br /> Gastanks and pumps...............................................................................................44).W 12.00 <br /> Back-up izenerator gas line <br /> a. 10 Kv or less. 30 <br /> b. Over IOKv........ 50.00 <br /> 19 Each re-inspection..........................."""..........,........................................ 25-0030.00 <br /> fZO Each additional final inspection.......................................................................... 38:99 60.00 <br /> (e) All plumbing installations requiring a permit shall be inspected by the plumbing <br /> inspector three (3) times, once each for underground work, rough-enin work, and final <br /> completion. A complete line test shall also be supervised by the plumbing inspector. The <br /> plumbing permit holder shall notify the plumbing inspector at least twenty-four (24) hours in <br /> advance of the time the work is ready for inspection. If the work does not pass inspection, a <br /> reinspection fee of twenty five dellews thirty dollars $30.00 shall be charged for each future <br /> inspection of that stage of work. <br /> Section V. Chapter 6, Article 1, Section 6-24(c) of the South Bend Municipal Code be <br /> and hereby is amended to read as follows: <br />