My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2672 approving/authorizing the execution of an addendum to the Master Agency Agreement (Michigan Street S-Curve Removal)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2672 approving/authorizing the execution of an addendum to the Master Agency Agreement (Michigan Street S-Curve Removal)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:58:04 PM
Creation date
5/24/2011 2:02:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br />Bid Package 1 shall comprise of the following items: <br />1. The ENGINEER shall design a southbound exclusive right turn lane <br />at the intersection of Michigan Street and Bartlett Street, including <br />the signal modification and replacement of curb, sidewalk and tree <br />lawn. The bus shelter shall be removed and not relocated for the <br />right turn lane. The Corner of the parking lot will be reconfigured to <br />accommodate a tree lawn /sidewalk along the turn lane. The <br />feasibility of relocation of south crosswalk on Michigan Street will <br />also be checked There will be no provision of stamped concrete <br />crosswalks at this location. The total length of improvements along <br />Michigan Street is approximately 300 feet. <br />A new irrigated free lawn and lighting will be provided as part of this <br />item on the west side of Michigan Street <br />Z The ENGINEER shall design the widening of Bartlett Street, west of <br />Michigan Street, to provide a westbound left turn for entrance into <br />the Bartlett Street Garage. The existing parallel parking row may be <br />removed on the north side of the street to accommodate the turn <br />lane. The total length of improvements along Bartlett Street is <br />approximately 300 feet <br />A new irrigated tree lawn and lighting will be provided as part of this <br />item on the north side of Bartlett Street. <br />3. The ENGINEER shall design Madison Street for two -way traffic <br />between Lafayette' Street and Michigan Street. The design of <br />Madison Street shall include removing the existing brick pavement <br />and reconstructing with full -depth asphalt pavement from Lafayette <br />Street to Michigan Street The curb and sidewalks will also be <br />replaced. If allowed by the existing R/W, a center turn lane will be <br />accommodated. The total length of improvements along Madison <br />Street is approximately 900 feet <br />A new irrigated tree lawn will be provided as part of this item on both <br />sides of Madison Street. <br />4. The ENGINEER shall design placement/replacemenf of curb and <br />sidewalks, as needed, on Marion Street, between Michigan Street and <br />Lafayette Street. The existing bituminous pavement along Marion <br />Street will be milled and overlayed with V/2" of surface. The total <br />length of improvements along Marion Street is approximately 700 <br />feet <br />3of13 <br />Supplemental Agreement No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.