My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2672 approving/authorizing the execution of an addendum to the Master Agency Agreement (Michigan Street S-Curve Removal)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2672 approving/authorizing the execution of an addendum to the Master Agency Agreement (Michigan Street S-Curve Removal)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:58:04 PM
Creation date
5/24/2011 2:02:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. The ENGINEER shall design Lafayette Street, between Madison <br />48 Street and Navarre Street The design shall include removing the <br />existing brick pavement and reconstructing with full -depth asphalt <br />pavement from Madison Street to Navarre Street The total length of <br />improvements on Lafayette Street is approximately 1,000 feet. <br />There will be no improvements to the sidewalk and the lighting for <br />this item. <br />6. The ENGINEER shall design placementlreplacement of curb and <br />sidewalk, as needed, on Main Street, between Marion Street and <br />Navarre Street, on the west side of street. The existing bituminous <br />pavement along Main Street will be milled and overâ–ºayed with 9%" of <br />surface. The OWNER desires to provide angled parking on Main <br />Street on the east side, from Main Street to approximately 250 feet <br />north. In accordance with the supplied plan (Figure 3), sidewalk will <br />be replaced and planting restored, where available. The total length <br />of improvements along Main Street is approximately 500 feet. <br />A new irrigated tree lawn will be provided as part of this item on the <br />west side of Main Street. <br />T. The ENGINEER shall design for the removal of the concrete inhll for <br />the provision of irrigated tree lawn on the east side of Michigan <br />Street, between Navarre Street and Bartlett Street, to match the west <br />side of the street This will also include replacement of sidewalk and <br />curb, as necessary. Michigan Street will be milled and overlayed <br />with 9%" of surface. Also, the electrical system will mirror the <br />existing west side. Electrical outlets will be provided on east side <br />tree lawn from Marion Street to Bartlett Street. The existing frees in <br />this block can be removed and replaced The total length of <br />improvements along Michigan Street is approximately 600 feet . <br />The provision of trees in the tree lawn is subject to INDOT review and <br />approval. There will be no provision of lighting for this item. <br />8. The design of Michigan Street from north of LaSalle Street to <br />Madison Street shall include pavement marking changes only to <br />facilitate a left turn lane from northbound Michigan Street to <br />westbound Madison Street and three north bound lanes on Michigan <br />Street from Madison Street to Marion Street The concrete infrll will <br />be removed for the provision of irrigated tree lawn on the east and <br />west sides of Michigan Street, between Madison Street and LaSalle <br />Street. This will also include replacement of sidewalk and curb, as <br />necessary. Michigan Street will be milled and overlayed with 1%" of <br />surface. The total length of improvements on Michigan Street is <br />approximately 600 feet. <br />4 of 13 <br />Supplemental Agreement No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.