Laserfiche WebLink
operation or for violating any pretreatment standard or requirement, the <br />City may at any time, on its own initiative or in response to a petition <br />received from a uUser, and in accordance with procedures in 40 CFR <br />403.8(f)(6), determine that such u User should not be considered a <br />-,Significant }industrial uUser. <br />(hhhh) Significant noncompliance or (SNC) shaft means: <br />(a) M Chronic violations of wastewater dDischarge limits, defined here <br />as those in which sixty -six (66) percent or more of wastewate <br />measur-emen4s taken all of the measurements taken for the same,_ pollutant <br />parameter during a six -month period exceed Eby_ any magnitude) the daily <br />maximum limit or- aver-age limit fer- the same <br />ameurt a numeric Pretreatment Standard or Requirement, including <br />instantaneous limits as defined by 40 CFR 403.3(1); <br />(b) (2) Technical rReview -,Criteria (TRC) violations, defined here as <br />those in which thirty -three (33) percent or more of .,,.,� all of the <br />measurements taken for eaeh the same pollutant parameter during a six - <br />month period equals or exceeds the product of the daily ffiaximum lifnit-eT <br />the —tee- limit the numeric Pretreatment Standard or Requirement <br />includin g instantaneous limits multiplied by the applicable er- iter-i-a TRC <br />T( RC ° 1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other <br />pollutants except pH); <br />(e) tD Any other a;� violation of a Pretreatment Standard or <br />Requirement that the Director belie=ves determines has caused, alonge or in <br />combination with other dDischarges, llnterference or pPass tThrough <br />(including endangering the health of Bureau POTW personnel or the <br />general public); <br />(d) f4,) Any discharge of a pollutants that has caused imminent <br />endangerment to the-- puhlieor to human health welfare or to the <br />environment, or has resulted in the Bureau's POTW's exercise of its <br />emergency authority to halt or prevent such a discharge; <br />(e) LQ Failure to meet, within ninety (90) days 4after the scheduled date, <br />a compliance schedule milestone contained in a wastewater discharge <br />permit or enforcement order for starting construction, completing <br />construction, or attaining final compliance; <br />(0 L6) Failure to provide, within thirty (30) days after the due date, any <br />required reports, ineluding such as baseline monitoring reports, ninety (90) <br />day compliance reports, periodic self monitoring reports, and reports on <br />compliance with compliance schedules; <br />15 <br />