REGULAR MEETING APRIL 11. 2011 124 <br /> AWARD PROPOSAL — HYDROELECTRIC FEASIBILITY STUDY — PROJECT NO. 110- <br /> 092B (EECBG) <br /> Mr. Jonathan Burke, Energy Office, advised the Board that on February 14, 2011, submittals for <br /> the Request for Qualifications were received and opened for the above referenced project. After <br /> reviewing those submittals, Mr. Burke recommended that the Board award the contract to the <br /> lowest responsive and responsible bidder, Lawson-Fisher Associates, 525 West Washington <br /> Street, South Bend, Indiana 46601, in the amount of$84,050.00. Therefore, Mr. Littrell made a <br /> motion that the recommendation be accepted and the Proposal be awarded as outlined above. <br /> Mr. Inks seconded the motion, which carried. <br /> APPROVE BID AWARD EXTENSION—ASPHALT EMULSION MATERIALS (MVH� <br /> Mr. Rob Nichols, Engineering, advised the Board that on April 12, 2010, the above referenced <br /> bid was awarded to the lowest responsible, responsive bidder, Bit-Mat Products of Indiana, PO <br /> Box 428,Ashley Indiana, 46705. Bit-Mat Products has agreed to extend the unit prices to include <br /> the 2011 paving season. Mr. Nichols recommended that the Board approve the bid award <br /> extension of the 2010 unit prices. Therefore, Mr. Gilot made a motion that the recommendation <br /> be accepted and the bid award extension be approved as outlined above. Mr. Inks seconded the <br /> motion,which carried. <br /> APPROVE REVISED CHANGE ORDER NO. 2 — RAW SEWAGE PUMP NO. 3 DRIVE <br /> REPLACEMENT—PROJECT NO. 109-071 —(2007B SEWER BOND) <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted revised Change Order No. 2 on <br /> behalf of Thieneman Construction, Inc., 3313 E. 83`a Place, Merrillville, Indiana, 46410, <br /> indicating the Contract amount be increased by$8,258.00 for a modified Contract sum, including <br /> this Change Order, in the amount of$187,258.00. Mr. Villa noted the Board approved Change <br /> Order No. 2 at their previous meeting of March 28, 2011 in the amount of$5,135.00. It was later <br /> discovered that should have been Change Order No. 3. Mr. Villa stated he is now correcting the <br /> record with the revised Change Order No. 2 and Change Order No. 3. Upon a motion made by <br /> Mr. Littrell, seconded by Mr. Inks and carried,the revised Change Order No. 2 was approved. <br /> APPROVE CHANGE ORDER NO. 3 — RAW SEWAGE PUMP NO. 3 DRIVE <br /> REPLACEMENT—PROJECT NO. 109-071 —(2007B SEWER BOND� <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br /> of Thieneman Construction, Inc., 3313 E. 83�d Place, Merrillville, Indiana, 46410, indicating the <br /> Contract amount be increased by $5,135.00 for a modified Contract sum, including this Change <br /> Order, in the amount of$192,393.00. Mr. Villa noted the Board approved Change Order No. 2 at <br /> their previous meeting of March 28, 2011 in the amount of$5,135.00. It was later discovered <br /> that that should have been Change Order No. 3. Mr. Villa stated he is now correcting the record <br /> with the revised Change Order No. 2 and Change Order No. 3. Upon a motion made by Mr. <br /> Littrell, seconded by Mr. Inks and carried, the revised Change Order was approved. <br /> APPROVE CHANGE ORDER NOS. 5, 6, 7 & 8 — TRAFFIC SIGNAL MODERNIZATION <br /> �WESTERN AVENUE)—PROJECT NO. 108-065 (FHWA,� <br /> Mr. Gilot advised that Ms. Thia Vawter, Engineering, has submitted Change Order Nos. 5, 6, 7, <br /> and 8 on behalf of Michiana Contracting, Inc., 7843 Lilac Rd., Plymouth, Indiana 46563, <br /> indicating the Contract amount be changed as follows: <br /> 1. Change Order No.: 5 <br /> a) Increase Amount: $625 <br /> b) Percent of Increase: 0.099% <br /> c) New Contract Amount: $662,180.80 <br /> 2. Change Order No.: 6 <br /> a) Increase Amount: $1,225 <br /> b) Percent of Increase: 0.193% <br /> c) New Contract Amount: $663,405.80 <br /> 3. Change Order No. 7 <br /> a) Increase Amount: $130 <br /> b) Percent of Increase: 0.021% <br /> c) New Contract Amount: $663,535.80 <br /> 4. Change Order No. 8 <br /> � a) Increase Amount: $850 <br />