My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(6)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
03-22-11 Packet
>
6C(6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 8:09:47 AM
Creation date
3/21/2011 10:11:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement for Professional Services I Master Plan / Revitalization of Voorde Park — South Bend, IN I Page 2 of 4 <br />South Bend Community & Economic Development Dept. and Lehman & Lehman, Inc. ©Copyright 20111 March 1, 2011 <br />detailed program for the proposed new facilities and new uses. This Program will be used by the <br />Consultant in developing schematic design proposals. The program will address the following: <br />i) Impact of the Property Ownership Changes: The changes in ownership of the property (sale <br />and acquisition) will be handled by the City of South Bend. The Consultant will supply site <br />plan exhibits of the Voorde Park Development concepts as support to the legal transfers and <br />related processes. <br />ii) Community Space: The central core of the park evaluation of current conditions will be done <br />by the Consultant with recommendations to the renovation and replacement of the various <br />components, tennis courts, playground equipment, hard & soft surface play courts, parking <br />and circulation, etc. Potential for additional shelters, restrooms and maintenance facilities <br />will be evaluated and planned. <br />iii) Access and Circulation: Park circulation will be designed and planned including incorporation <br />into the City's Alternative Transportation routes and circulation within Voorde Park. <br />iv) Play Fields: The existing ball field will be evaluated with potential renovation or <br />replacement. New fields and layouts for both soccer and rugby fields will be studied along <br />with related parking, access and support facilities (i.e. Restrooms, shelters, concessions, <br />etc.) <br />v) Park Department Programming: Meet with Park Department programming staff to establish <br />a priority of needs. <br />vi) Public Meeting: Conduct with the Owner public input venue to confirm programming needs <br />and priorities. <br />vii) Phasing and Schedule: Develop potential project phasing and tentative project timetable. <br />viii) Probable Construction Costs: Assist in developing a preliminary estimate of Construction <br />Cost for the Building component. <br />ix) Agency Meetings: As preliminary plans are developed, the Consultant will meet with <br />representatives from the City Building Department to review the scope of the project for <br />compliance. <br />c) MASTER PLANNING DESIGN <br />i) Master Plan: The Consultant will review design alternatives for the new park revitalization <br />with the Owner. Upon review of an initial set of preliminary drawings with Owner, <br />subsequent revisions to a select scheme will be developed. Schematic alternatives for the <br />revitalization of Voorde Park will be based upon the program established. The Consultant <br />will review the schemes with Owner and develop a selected scheme in greater detail. It is <br />anticipated that there will be two sets of revisions to the initial set of schematic design <br />drawings submitted. <br />ii) Illustrated Plans: The Consultant will provide, for the Owner's use, a colored, illustrated site <br />plan of the Master Plan / Revitalization Plans for Voorde Park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.