My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - KIL Architecture and Planning - WWTP Admin Bldg Masonry Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - KIL Architecture and Planning - WWTP Admin Bldg Masonry Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:36:28 AM
Creation date
6/19/2018 2:14:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit L <br />B. The Owner will be billed at the Standard 2018 hourly rates as follows: <br />Principal Architect <br />$155.00/hour <br />Project Architect, Level Ili <br />$118.00/hour <br />Project Architect, Level I <br />$95.00/hour <br />Graduate Architect, Level III <br />$88,00/hour <br />Graduate Architect, Level 11 <br />$80.00/hour <br />Graduate Architect, Level I <br />$77.00/hour <br />Senior Project Designer <br />$86.00/houir <br />Project Designer <br />$80.010/hour <br />Technical CAD Designer <br />$78,00/hour <br />Intern Architect, Level III <br />$60,,00/hour <br />Intern Architect, Level 11 <br />$55.00/hour <br />Intern Architect, Level I <br />$50.00/hour <br />Clerical Staff <br />$42.00/hour <br />March 22, 2018 <br />These rates are subject to review and may be changed at the beginning of each calendar <br />year. <br />V1. REIMBURSIBLES: <br />The Architect will bill reimbursable costs to the Owner without a mark-up. Reimbursable <br />expenses entail travel mileage, long distance calls, reproduction costs, photographic <br />documentation, mailing, delivery, and handling of documents or other similar expenses incurred <br />by the Architect in the interest of the Project. <br />Vi WORK SCOPE QUALIFICATIONS: <br />Architectural and Engineering consultation services requested by the Owner beyond the <br />scope of this Contract will be billed at the Architect's hourly rates as stated below (or <br />Consultant's hourly rates). The following are additional services that may be required or <br />requested by the Owner that are not included in the Basic Scope of Services (Design <br />Phase I) Preliminary Design: <br />a. Changes to the scope of the program as requested by the Owner after the preliminary <br />design has begun or completed as outlined under Article LC above, requiring additional <br />time on behalf of the Architect. <br />b. Civil engineering is not included in the Phase I Preliminary Design, but would be part <br />of the Phase 11 Consultation which is limited to control of the ponding storm water at the <br />west side of the buildiing. <br />c. Site Survey is not included and a property survey (boundary, topo, site utilities, location <br />of building, etc.) to be provided by the Owner for use by the Architect. <br />d. Development of a comprehensive overall site plan and site design can be provided as <br />an additional service. <br />K I L S13 Waste Water Treatment Plant Proposal <br />ARCHITECTURE Kil A/P Proj# 18013 <br />PLANNING, Page 3 of 5 <br />tW,W_JW_1au21bgtUM,=.1 <br />1126 LMCOLNWAY EAST SOUTH BEND I N 46601 (674) 288.2654 VOICE 289, 2420 FA X <br />
The URL can be used to link to this page
Your browser does not support the video tag.