My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - KIL Architecture and Planning - WWTP Admin Bldg Masonry Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - KIL Architecture and Planning - WWTP Admin Bldg Masonry Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:36:28 AM
Creation date
6/19/2018 2:14:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit L <br />FFM W24 K11 I] <br />cl. Verify leaks at roof above suspended ceiling, repair roof deck and provide <br />new membrane roof, if necessary (TPO white membrane, 20 yr. warranty). <br />e. Replace damaged carpet <br />f. Repaint walls <br />g. Replace damaged ceiling tiles <br />h. Replace/modify windows, update weather-stripping, provide sealant <br />I. Replace window blinds damaged by water infiltration. <br />j. Establish budget construction cost based on schematic design remodeling <br />and upgrades scope identified <br />C. SCHEMATIC DESIGN: Once scope items LA has been completed and items 1,13 have been <br />confirmed, develop schematic design alternatives for the remodeling will be developed for <br />review with the Owner. At least 2 schemes will be presented to the Owner at the first <br />meeting. Upon review of an initial set of preliminary drawings with Owner, subsequent <br />revisions to the selected scheme will, be developed. One revision to the chosen initial <br />schematic option is included In this preliminary study. Upon schematic design approval <br />by the Owner, the Architect will develop an updated in-house estimate for Construction <br />Cost, <br />PHASE 11 CONSTRUCTION DOCUMENTS: <br />A. Once Owner approval of the Schematic Preliminary Design is gained and a directive has <br />been issued to proceed with detailed Design Development, Construction Documents and <br />Specifications (Phase 11) for the selected design solution, a full service contract based <br />upon, a fixed fee, percentage of the cons ' truction cost or extending this contract at an <br />hourly rate, will be negotiated. This full service contract wound include detailed <br />architectural consultation along with structural, mechanical and electrical engineering <br />consultation for a submittal to the local building department. The level of detail required <br />for a set of permit, bidding and construction documents will be determined prior to <br />initiating this final design phase. <br />COMPENSATION: <br />A. The Documentation (Design Phase I) per Article LA will be developed at a fee of $1,200.00 <br />(one thousand two hundred dollars). <br />B. The Preliminary Design Services (Design Phase 1) per Article 1,13 and LC will be developed <br />at a fee of $8,500.00 (eight thousand five hundred dollars). <br />A. The Construction Documents (Design Phase 11) per Article ILA will be developed at a fee <br />range of $13,000.00 (thirteen thousand dollars) to $20,000.00 (twenty thousand) dependiing <br />upon scope of work finalized and budgeted per Phase l Design. <br />K I L SB Waste Water Treatment Plant Proposal <br />ARCHITECTURE Kil A/P lProj# 18013 <br />P L A N N, I N G: Page 2 of 5 <br />1126 LINCOLNWAY EAST SOUTH BEND I N 46601 (574) 288.2654 VOICE 289, 2420 FA X <br />
The URL can be used to link to this page
Your browser does not support the video tag.