My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - KIL Architecture and Planning - WWTP Admin Bldg Masonry Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - KIL Architecture and Planning - WWTP Admin Bldg Masonry Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:36:28 AM
Creation date
6/19/2018 2:14:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit L March 22, 2018 <br />Agreement for Architectural Design and Planning Services <br />Remodeling to the South Bend Waste Water Treatment Plant <br />3113 Riverside Drive <br />South Bend, IN 46628 <br />This agreement defines the scope of preliminary architectural design and planning services, <br />Between the Owner: City of South Bend <br />(hereinafter referred to as Owner) <br />and the Architect: Kil Architecture/Planning (hereinafter referred to as Architect) <br />for the following project: South Bend Waste, WaterTreatment Plant <br />(hereinafter referred to as Project) <br />The following proposal is submitted in response to your request for Architectural Services. This <br />proposal is for limited scope remodeling of the South Bend Waste Water Treatment Plant. Scope <br />includes Architectural design, based upon the program approved by the Owner. <br />Pending Schematic Design Approval, Architect would enter into Design Phase 11 Agreement, <br />which would be to provide Contract Documents for bidding and permitting for the work required <br />to bid and construct the proposed interior and exterior remodeling improvements. <br />1. BASIC SCOPE, OF SERVICES (DESIGN PHASE 1): <br />A. DOCUMENTATION PHASE.' <br />Owner has some existing floor plan documentation that will serve as a basis for developing <br />existing conditions plans. The Architect will visit site and take photos. Architect to provide <br />field verification of plan documentation to develop existing conditions AutoCAD floor plans <br />Architect to develop CAD plans and elevations from drawings provided by Owner and field <br />measurements. The Architect will photograph the building in the areas to be modified and <br />remodeled. <br />B. PROGRAM SCOPE: <br />1, Owner has concerns about water damage infiltrating the existing envelope. <br />2. Identify and recommend remodeling to address exterior envelope upgrades to <br />prevent water infiltration: <br />a. Repair Masonry: tuck -point, as required <br />b. Repair/replace deteriorated steel lintels, parapet damage, wall cracks, etc. <br />c. Modify grade and provide storm system at west side to direct water away <br />from entry and exterior walls <br />K I L 56 Waste Water Treatment Plant Proposal <br />ARCHITECTURE Kiil A/P Proj# 18013, <br />PLANNING Page 1 of 5 <br />wwBJ1ar&N(Q9w&g= <br />1126 LIN COLNWAY EAST SOUTH BEND IN 46601 (574� 288.2654 VOICE 289. 2420 FA X <br />
The URL can be used to link to this page
Your browser does not support the video tag.