My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lawson Fisher Assoc. - West Bank Trail Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lawson Fisher Assoc. - West Bank Trail Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:39:53 AM
Creation date
5/9/2018 1:26:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. St. Joseph River channel survey along proposed piers at new pedestrian bridge under <br />Jefferson Boulevard and at proposed fishing pier near Pier Park. <br />3. Additional survey required south of Jefferson Boulevard beyond original limits of <br />Schematic Design. <br />B. The topographic survey will be such to provide a complete surface model, complete linework, <br />utility linework (from various sources), surface types labeled, horizontal and vertical control <br />(monumented and referenced), and survey notes and reporting. This proposal does not include <br />topography within the West Race, beyond the limits of the retaining walls along St. Joseph Street <br />or the east face of the Century Center, and river topography beyond the immediate areas shown <br />in the Schematic Design Document, The vertical datum shall be NAVD88. <br />A1.02 Geotechnical Evaluation <br />A. Earth Exploration Inc. (EEI) will conduct a geotechnical analysis at key locations along the West <br />Bank Trail Corridor. <br />B. Perform appropriate laboratory test including visual soil classification, hand penetrometer <br />readings, moisture content and grain size analysis. <br />C. Prepare a technical report which will include a summary of finding and recommendations for <br />geotechnical consideration regarding: <br />1. Subgrade preparation. <br />2. Pier or pile depths to support boardwalk elements <br />D. A proposed soil boring location map will be developed for the project site. <br />E. EEI will coordinate with the Owner to gain access to the boring locations. <br />A1.03 Prepare Construction Documents <br />A. Preliminary Plan Development shall consist of a 60% complete set. This set will utilize and build <br />upon the drawings prepared during the Schematic Design phase. <br />1. Develop proposed line work <br />2. Develop project Title and Index Sheets <br />3. Prepare preliminary Typical Section Sheets <br />d. Develop preliminary Plan and Profile Sheets <br />5. Revise preliminary quantities calculations <br />6. Revise Engineer's Estimate of Probable Construction Costs <br />Page 2 <br />(Exhibit A -- Engineer's Services) <br />EJCDC E-500 Agreement BeNveen Owner and Engineer for Professional Services <br />Copyright cO 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.