Laserfiche WebLink
too <br />Friday July 25th. 11913. Continued. <br />..Bond and contract for water taps on College Street from Washington Aveme to <br />Michigan Avenue, under Improvement Resolution No.- 276. signed by Thomas Williams <br />as priniepal and .M. F. Calnon as surety, was approved by the Board. <br />Bond and contract for water connections on Pine Street from Napier Street to <br />L.S.& M.S. RY. Co. Under Improvement Resolution No. 280, signed by Thomas Williams, <br />as principal and M. F. Calnon as surety, was approved by the Board. <br />Bond and contract for water connections on High Street from Sam@le Stree t to <br />Broadway Street, under Improvement Resolution no. 277: signed by Thomas Williams <br />. as principal and M..F. Calnon as surety was approved by the Board. <br />Bond and contract for water taps on Dunham Street from Arnold Street to Harris Stree <br />under improvement Resolution No..278. ,signed by Thomas Williams as principal and <br />M.F.Calnon as surety, was approved by the Board. <br />A:wardi-ng of contract on Pipe sewer on Eddy, Parry and FriLnS10 Streets, the same was <br />a deferred' uhtil Taesda' y July 29t h. ,1913 at 10: 00 A.M. <br />The City Engineer filed the following estimates. <br />✓ Estimated cost of the Pipe Sewer on Cleveland Avenue from Van Buren Street to <br />Vassar Avenue, under Improvement Resolution No. 2E5. for the amount of.....2,600.00 <br />,,"Estimated cost of the pipe sewer improvement on Franklin. Street from Indiana Ave., <br />to Calvert Street, under improvement Resolution No. 286. for the amount of... 32000.0 <br />------------------ <br />President..' <br />