My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/25/1913 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1913
>
07/25/1913 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:48:27 PM
Creation date
5/3/2018 2:11:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/25/1913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
too <br />Friday July 25th. 11913. Continued. <br />..Bond and contract for water taps on College Street from Washington Aveme to <br />Michigan Avenue, under Improvement Resolution No.- 276. signed by Thomas Williams <br />as priniepal and .M. F. Calnon as surety, was approved by the Board. <br />Bond and contract for water connections on Pine Street from Napier Street to <br />L.S.& M.S. RY. Co. Under Improvement Resolution No. 280, signed by Thomas Williams, <br />as principal and M. F. Calnon as surety, was approved by the Board. <br />Bond and contract for water connections on High Street from Sam@le Stree t to <br />Broadway Street, under Improvement Resolution no. 277: signed by Thomas Williams <br />. as principal and M..F. Calnon as surety was approved by the Board. <br />Bond and contract for water taps on Dunham Street from Arnold Street to Harris Stree <br />under improvement Resolution No..278. ,signed by Thomas Williams as principal and <br />M.F.Calnon as surety, was approved by the Board. <br />A:wardi-ng of contract on Pipe sewer on Eddy, Parry and FriLnS10 Streets, the same was <br />a deferred' uhtil Taesda' y July 29t h. ,1913 at 10: 00 A.M. <br />The City Engineer filed the following estimates. <br />✓ Estimated cost of the Pipe Sewer on Cleveland Avenue from Van Buren Street to <br />Vassar Avenue, under Improvement Resolution No. 2E5. for the amount of.....2,600.00 <br />,,"Estimated cost of the pipe sewer improvement on Franklin. Street from Indiana Ave., <br />to Calvert Street, under improvement Resolution No. 286. for the amount of... 32000.0 <br />------------------ <br />President..' <br />
The URL can be used to link to this page
Your browser does not support the video tag.