Laserfiche WebLink
izs <br />Tuesday M:.iy lst., 1T3. Continued. <br />Concerning the improvement, of the roa=Xd�.Ta,y of Bowman Street from <br />Miami Street to -Lear Street with asphalt, asphaltic concrete, bitu;ithtc, concrete or <br />brick, in pursuance to Resolution No. 1108 this Board finds that no petition has been filed <br />Tith aaid Board 'fey a majority in number of the freeholders residei_ng on said street �,o <br />lie improved, requesting that it be improved with a different, kind of pavement hat the <br />kind heretofore.adopted by the Board in its preliminary order; and the City Engineer <br />reports that the Williston Construction Company is the lowest and best bidder for the kind <br />of pavement heretofore adopted by the Board, and the Board rind that the White Construction <br />Co, is the lowest and best bidder and hereby lets the congbeect for said improvement to <br />them and orders tha{ said improvement be made with Shee$. asphalt using Mexican Asphalt <br />and all proceedings heretfore had in this muter are hereby confirmed and ratified. <br />L. B. SLAUGHTER <br />BOARD OF PUBLIC WORKS L. P. HARDY <br />ALBERT F. HONER <br />Att.ested:- <br />Veronica C. Sweeney <br />Clerk of the Board. <br />Dated this lst . day of May 1923. <br />Concerning the improvement of the roadway of Eddy Street from La Salle <br />Avenue to West line of South Bend Avenues by resurfacing with asphalt, asphaltic concrete <br />bitulithie, concrete, or brick, in pursuance to Resolution No. 1104 this Board finds that <br />no petition has been filed with said Board by a ma?41r. ity in number of the freeholders <br />residing on said street"to be improved, requesting that it, be improved with a different, <br />kind of pavement than the kind heretofore adopted by the Board in its preliminary order; <br />and the City Engineer reports that the White Construction Co-O is the to Pst and best bidder <br />for the kind of pavement heretofore adopted by the Board, and the Board finds that the <br />White Construction. Co. is the lowest and best, bidder and hereby lets the contract for daid <br />improvement to them and orders that said improvement be made with sheet asphalt using <br />Mexican Asphalt and all proceedings herettore had in this matter are hereby confirmed and <br />rat,if ied-i <br />L. B. SLAUGHTER <br />BOARD OF. PUBLIC WORKS L. P. HARDY <br />ALBERT F. HONER <br />Attested::- <br />Veronica C. Sweeney <br />Clerk of the Board. <br />Dated this 1st. day of May 1923. <br />Concerning the improvement os the reardway of -Lafayette Street from <br />Marquette Avenue to Wakewa Avenue and Marquestte from Lafayette Street to Iroquois Street <br />and Wakewa Avenue from Lafayette Street to Iroquois Street with asphalt, asphaltic concrete <br />bitulithic, concrete or brick, in pursuance to,Resolution No. 1111 this Board finds that no <br />petition has been filed with.said Board by a majority in number of.the freeholders residing <br />on said street to be improved, requesting that it be improved with a different kind of <br />pavement than the kind heretofore adopted by the Board it int6s preliminary order; and the <br />,`City Engineer reports that the White Construction Co., is the lowest and best bidder for the <br />kind of pavement heretofore adopted by the Board, and the Board find that the White <br />Construction Company is the lowest and best bidder and hereby lets the contract for said <br />improvement to them and orders that the said improvement be made with Sheet Asphalt using <br />Mexican Asphalt and all proceedings heretofore had in this matter are hereby confirmed <br />and ratified. <br />L. B. SLAUGHTER <br />BOARD, OF PUBLIC WORKS. L. P. HARDY <br />ALBERT F.HHUFR <br />Attested: - <br />Veronica C. Sweeney <br />Clerk of the Board. <br />Dated this 1st, day of May 1923. <br />