Laserfiche WebLink
REGULAR MEETING SEPTEMBER 13 2010 269 <br /> RIETH-RILEY CONSTRUCTION <br /> 25200 State Road 23 <br /> South Bend, Indiana 46614 <br /> Bid was signed by: Mr. Todd Gosc <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: $237,900.00 <br /> WALSH & KELLY,INC. <br /> 24358 State Road 23 <br /> South Bend, indiana 46614 <br /> Bid was signed by: Mr. Kevin Kelly <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: $305,787.60 <br /> Upon a motion made by Mr. Littrell, seconded by Mr. Gilot and carried, the above bids were <br /> referred to Engineering for review and recommendation. <br /> OPENING OF BIDS — ERSKINE DETENTION POND RE-CONSTRUCTION — PROJECT <br /> NO. 110-056 (SSDA TIF) <br /> This was the date set for receiving and opening of sealed bids for the above referenced project. <br /> The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br /> County News, which were found to be sufficient. The following bids were opened and publicly <br /> read: <br /> ANCON CONSTRUCTION CO.,INC. <br /> 2146 Elkhart Road <br /> Goshen, Indiana 46526 <br /> Bid was signed by: Mr. Rhett Fisher <br /> Non-Collusion Affidavit was not included <br /> Non-Discrimination Commitment from was not included <br /> Five percent(5%)Bid Bond was submitted <br /> BID: $1,100,523.48 <br /> C&E EXCAVATING, INC. <br /> 53767 CR 9 <br /> Elkhart, Indiana 46514 <br /> Bid was signed by: Mr. Al Johnson <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: $1,171,260.50 <br /> HRP CONSTRUCTION <br /> 5777 Cleveland Road <br /> South Bend, Indiana 46628 <br /> Bid was signed by: Mr. Paul Fallon <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: $1,255,000.00 <br />