My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/15/1924 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1924
>
04/15/1924 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:29:15 PM
Creation date
4/3/2018 10:54:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/15/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesday April 15th, 1924. Continued. <br />surface: <br />Bid of Williston. 'Construction Company: <br />Curb per lineal foot <br />Grading per cubic yard <br />Sheet asphalt, Mexican, per'square yard <br />Retaining wall -per lineal foot <br />Asphaltic Cnccrete, Mexican, per square yard <br />8 inch conduit pipe per lineal foot <br />Storm water inlets complete <br />Marginal curb per lineal foot <br />Resetting inlets each <br />Resetting manhole covers each <br />Certified check, $495.00 <br />Bid of White Construction Company: <br />" .50 <br />.80 <br />2.67 <br />9.00 <br />2.42 <br />.85 <br />14.00 <br />.40 <br />3.00 <br />3.00 <br />Grading, concrete base and asphalt top <br />Sidewalk per square foot <br />Curb per lineal foot <br />.20 <br />Grading per cubic yard <br />.59 <br />Sheet asphalt, Mexican Oil, prer square yard <br />.85 <br />2.68 <br />Sheet asphalt, Trinidad, pel square yard <br />2.82 <br />Rwtaining wall per lineal foot <br />7.90 <br />Asphaltic concrete, Trinidad, per square yard <br />A-sphaltic concrete, Mexican <br />2.57 <br />Oil, per square yard <br />2.43 <br />8 inch conduit per lineal foot <br />Storm water inlet complete <br />.85 <br />12.50 <br />Marginal curie per lineal foot <br />.30 <br />Resetting inlets each , <br />3.80 <br />Resetting manholes each <br />3.00 <br />Certified check $495.00 <br />Bid of W. J. Lana Construction Company: <br />Grading per cubic yard <br />Sheet asphalt, Mexican, per square yard <br />.85 <br />2.71 <br />If Natural Lake asphalt be used add per elquare yard <br />Retaining wall per lineal foot <br />.15 <br />7.00 <br />Excavation necessary for this wall per cubic yard <br />.00 <br />Asphaltic Concrete pavement per square yard, Mexican <br />2.51 <br />8 inch conduit per lineal fo&t <br />Storm water inlets complete <br />.80 <br />25.00 <br />Marginal curb per lineal foot <br />.30 <br />Resetting inlets each <br />5.�0 <br />Resetting manholes each <br />5.00 <br />Certified check $495.00 <br />Bi'd of Plummer Construction Company: <br />Gradinc per cubic yard 1.00 <br />3 inch vertical fibre Veedersburg brick, gravel base, sand <br />filler per square yard 2,55 <br />For asphalt filler add per square yard 15 <br />k"dta'lhifig gall peg' iiii4ai feet 7.00 <br />Concrete pavement per square yard 2.40 <br />8 inch conduit pipe per lineal foot <br />Storm water inlets complete 12.00 <br />. <br />1.00 <br />1arginal curb per lineal foot <br />Resetting inlets each 35 . <br />Resetting manholes each 3.00 <br />00 <br />Certified check $495.00 <br />Bid of Reith Riley Construction Company:. <br />Sidewalk per square foot .20 <br />Curb Per lineal foot .60 <br />Grading per 64ble yard 1.00 <br />Mexican sheet asphalt per square yard 2.79 <br />Trinidad sheet asphalt per square yard 2.99 <br />Veedersburg brick with sand filler per square yard 2.65 <br />Veedersburg brick with bituminous filler per square yard, ravel 2.80 <br />$ ,ga se <br />etaining wall per <br />lineal foot <br />10.09- <br />Concrete pavement <br />per square yard <br />2.40 <br />Asphaltic concrete <br />using Mexican pe r square yard <br />2.49 <br />Asphaltic concrete <br />using Trinidad per square yard <br />2.69 <br />8 inch conduit pipe <br />Per lineal fot <br />1.00 <br />(1torm water inlets <br />complete <br />15.00 <br />Marginal curb per <br />lineal foot. <br />Resetting inlets each <br />.48 <br />3.00 <br />Resetting manholes <br />each <br />3.00 <br />Certified <br />check �95.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.