Laserfiche WebLink
253. <br />Tuesday April 15th, 1924. Continued. <br />Bid of C. H. Eldred on pavement of alley south of Division Street <br />from . <br />Franklin Street to Williams Street: � <br />.20 <br />,Cement. Walk per square foot <br />.60 <br />Cement curb per lineal fobt <br />' <br />1.25 <br />• Grading, per cubic yard <br />square <br />2,5 <br />Concrete pavement per yard <br />1. <br />' 8 inch conduit per lineal foot <br />" <br />.00 <br />20.00 <br />-Storm water- inlets complete <br />' <br />Marginal cubb per lineal foot <br />•�0 <br />10.00 <br />Resenting inlets each <br />' <br />10.00 <br />Resetting manholes each <br />No affidavit: bid irregulat; Certified check 100.00 <br />Bid of Plummer Construction Company on pavement of alley Snsth of <br />Division <br />street from Franklin Street to Williams Street: <br />1.00 <br />Grading per square yard <br />Brick, gravel base, sand filler per square yard <br />2.50 <br />55 <br />Ad&"Ifor asphalt filler per square yard <br />'50 <br />2. <br />_ Concrete pavement per square yard <br />.35 <br />' Marginal curd per lineal foot <br />" Certified Check $100.00. <br />' Pavement on Lafayette Bdilevard from Jefferson Street to DIVICION <br />Street <br />by the following bidders: <br />• Bid of Williston Construction Company: <br />.20 <br />' Sidewalk per square foot <br />.50 <br />• Curb per lineal foot <br />2.75 <br />• Grading per cubic yard <br />square <br />2.65 <br />Pavement, Mexican ar,sphalt,per yard <br />Asphaltic Concrete, Mexican asphalt, per square yard <br />40 <br />1.00 <br />8 inch conduit per lineal fo6t <br />14.00 <br />Storm water inlets complete each <br />.40 <br />Marginal curb per lineal foot <br />3.00 <br />Resetting inlets each <br />3.00 <br />° ResettinG manhole covers each <br />° Certified chec $624.00 <br />" Bid of The White Construction Company: <br />.20 <br />Sidewalk per square foot <br />.50 <br />° Curb per lineal foot <br />3.00 <br />Grading per cubic yard <br />" Sheet asphalt, Mexican Oil, per square yard <br />2.68 <br />Asphaltic Concrete, Trinidad Natural Lake per dquare yard <br />2.43 <br />Asphaltic Concrete, Mexican 0(j1L, per square yard <br />8 inch conduit per lineal foot " <br />.85 <br />12.50 <br />Storm water inlets complete each <br />.30 <br />Marginal curb per lineal foot <br />3.00 <br />' Resetting inlets each <br />3.00 <br />Resetting manhales each <br />" Certified check $624.00 <br />• Bid of T. J. Land Construction Company: <br />2.85 <br />• Grading per cubic yard <br />square <br />2.71 <br />" Sheet asphalt, Mexican, per yard <br />If Natural Lake asphalt be used add per square yard <br />.1.5 <br />2.8© <br />• Asphaltic concrete pavement per square yard, Mexican <br />8 inch vittified per lineal foot <br />25.00 <br />• Storm rater inlets complete <br />5.00 <br />Resetting manholes each <br />5.00 <br />Resetting inlets each <br />" Bid 6fReith Reilly CONSTRUCTION Company: <br />.20 <br />" 8idew_lk per square foot <br />.60 <br />• Curb per lineal foot <br />2.60 <br />• Grading per cubic yard <br />square <br />2..79 <br />Sheen asphalt, Mexican, per yard <br />2•6 <br />• Sheet asphalt, Trinidad, per square yard <br />2.65 <br />' Veedersburg brick, sand filler, per square yard <br />Veedersburg brick, bituminous filter per square yard gravel base <br />2.809 <br />_ <br />' Asphaltic concrete., Mexican Oil, per square.yard <br />2.69 <br />' Trinidad <br />1.00 <br />' 8 inch conduit pipe per lineal foot. <br />15.00 <br />' Storm water inlets each complete <br />'40 <br />" Marginal curb per lineal foot <br />3'00 <br />' Resetting inlets each <br />3.00 <br />Resetting manholes each <br />• Certified check $624.00 <br />The following bids were received for pavement on Fox Street from Michi§%n <br />Street to Fellows Street: <br />