Laserfiche WebLink
Tuesday April 15th, 1924. Continued. <br />The following bids were received on pavement .on Van Buren Street, from Lawn - <br />dale AVENUE to Sancome Street and, on Sancome street from Linooln Way West to California <br />Avenue <br />Bid Of Plummer Construction Company <br />Grading .per cubic yard 1.00 <br />3 inch vertical fibre Veedersburg brick, gravel base, sand <br />filler .per square yard 2 ; <br />Ad&r�fo r:"aspha -t filler per square yard <br />Concrete pavement per square yard 2.34 <br />• 8 inch'eonduit per- lineal foot 1.00 <br />Storm water inlets complete 12.50 <br />35 <br />Marginal curie per lineal fo&t • <br />" Resetting inlets each 3.000 <br />3.00 <br />Resetting manholes each <br />Certified check $410.00 <br />Bid of Northern Construction Company: <br />Grading per cubic yard 1.00 <br />Veedersburg 3 inch vitrified brick per square yard,'six inch <br />gravel base, .sand filler 2.65 <br />Same with 6 inch apphalt filler per square yard 2.80 <br />Same with concrete b_9S6.; asphalt filler per square yard 3.12.60 <br />Storm water inlets complete <br />8 inch conduit pipe per lineal foot 90 <br />M-arginal • curb per lineal fo&t . <br />45 <br />Resetting inlets each 3.00 <br />Resetting manholes each 3.00 <br />Certified check $410.00 <br />Bid of W. J. Lang Cons truction•Company: <br />Granding per cubic yard <br />•85 <br />Sheet asphalt, Mexican, per square yard <br />-2.71 <br />• If natural Lake asphaLt be used add per square yard <br />.15 <br />- Asphaltic concrete, Mexican, per square yard <br />2.51 <br />8 inch conduit pipe per lineal fo&t <br />.80 <br />25.00 <br />Storm water inlets complete <br />Marginal curb per lineal foot <br />.30 <br />5.00 <br />Resetting inlets each <br />5.00 <br />Resetting manholes each <br />Certified check S410.00 <br />• Bid of Reith Riley Construction Company: <br />Sidewalk per square foot <br />.20 <br />• Curb per lineal foot <br />.60 <br />1.00 <br />Grading per cubic yard - " <br />Sheet asphalt, Mexican, per square yard <br />2.79 <br />Trinidad <br />• Veedersburg brick, sand filler, per square yard <br />2.79 <br />2.65 <br />bituminous filler, gravel base <br />2.80 <br />concrete pavement per square yard <br />square <br />2.40 <br />2.69 <br />ASPHALTIC Concrete, MexicanOil per yard <br />2.9 <br />Trinidad <br />• 8 inch conduit pipe per lineal fo6t <br />1.00 <br />15.00 <br />Storm water inlets each <br />• Marginal curb per lineal foot <br />•40 <br />3.00 <br />• Resetting inlets each <br />3.00 <br />• Resetting mnholes each <br />CeRtified check N100 0 <br />Bid of White Construction Company: <br />• Sidewalk per square foot <br />•20 <br />• Curb per lineal foot <br />.50 <br />• Grading per cubic yard <br />• Sheet asphalt, Mexican Oil per square yard <br />.65 <br />2.68 <br />Trinidad <br />2.82 <br />" Asphaltic concrete, Mexican,Oil, per square yard <br />2.43 <br />Trinidad <br />2.57 <br />' 8 inch conduit per lineal foot <br />.85 <br />Storm water inlets complete <br />12.50 <br />Marginal curb per lineal foot <br />•30 <br />3.00 <br />° Resetting inlets each <br />• Resetting manholes each <br />3.00 <br />• Certified check $410.00 <br />Bid of Williston Construction company: <br />Curb per linea-1 foot <br />.50 <br />0 <br />grading per cubic yard <br />2.6$ <br />Sheet asphalt, Mexican per square yard <br />square <br />2.40 <br />Asphaltic eoMcraty, Mexican Oil, per yard <br />8 inch conduit per lineal foot <br />.85 <br />14.00 <br />^'torm water inlets complete <br />Marginal curb per lineal fod,t <br />.40 <br />3'00 <br />Resetting inlets each <br />