Laserfiche WebLink
132 <br />TUESDAY AUGUST 23rd. , 1927. <br />5,924.40. <br />No petttInn.shaving been filed for a change of type of pavement other <br />than that specified in the preliminary order for the pavement of Holland. Street from Wee <br />line of Meade Street to the east line of Kaley Street tinder Improvement Resolution No. <br />I895, the Board this 23rd., day of August, I927, hereby awards the contract for said <br />improvement to the Albert Construction Co., at their low bid of 4,309.80. <br />No petitions having been filed for a change of the type of pavement <br />other than that specified in the preliminary order for the pavement of Klley Street frog <br />Division Street to Colfax Avenue under Improvement Resolution No.I885, the Board this <br />23rd., day of August, 1927, hereby awards the contract for said said improvement to <br />the Albert Construction Co., at their low bid of 24,659.80. <br />This being the date set, bids were received, opened and read for the <br />following improvements: <br />Pavement on 26th., Street from. Jefferson Street to Mishawaka Avenue -and- <br />Improvement Resolution No.I866. Bids as follows: <br />concrete walk <br />concrete curb <br />marginal curb <br />grading <br />sheet asphalt <br />asphaltic concrete <br />resetting inlets <br />resetting II. H. C. <br />71. C. T. S. <br />W. C. S. S. <br />Sewer Conn. <br />8" pipe <br />Storm eater inlets <br />Albert Const. Co.. <br />.20 <br />,60 <br />.40 <br />I.00 <br />2.72 <br />2.59 <br />3.00 <br />3.00 <br />37.00 <br />27.00 <br />1.50 <br />I.00 <br />Reith Riley Co. <br />.20 <br />.50 <br />�40 <br />.94 <br />2.70 <br />2.56 <br />3.00 <br />3.00 <br />34.50 <br />28.00 <br />I.00 <br />12.50 <br />Williston Co. <br />.40 <br />1.05 <br />2.75 <br />2.60 <br />3.00 <br />3.00 <br />37.50 <br />30;00 <br />I.00 <br />Pavement on Howard Street from South Bend Avenue to the east line of 1bIo <br />ley Sub under Improvement Resolution No.I889. <br />Concrete walk <br />Concrete curb <br />marginal curb <br />grading <br />heet asphalt <br />asphaltic concrete <br />Inlets to be removed <br />reset. inlets <br />reset. 11. H. C. <br />Storm water inlets <br />Water C. L. S. <br />Water C. S. S. <br />sewer Conn. <br />XXX= 8" pipe <br />Albert Const. <br />.20 <br />.50 <br />.40 <br />I.00 <br />2.70 <br />2.57 <br />3.00 <br />3.00 <br />3.00 <br />30.00 <br />22.00 <br />I;50 <br />I.00 <br />Co , Ri eth Riley C. <br />.20 <br />.50 <br />.40 <br />I.00 <br />2.75 <br />2.63 <br />3.00 <br />3.00 <br />3.00 <br />12.50 <br />3I.50 <br />25.00 <br />I.00 <br />Williston Co., <br />.40 <br />1.05 <br />2.75 <br />2.60 <br />3.00 <br />3.00 <br />29.00 <br />23.00 <br />I.00 <br />Pavement on Parry Street from Division Street to the 5th., alley South <br />of Division Street under Improvement Resolution No.I897. <br />Concrete walk <br />Concrete curb <br />marginal curb <br />grad.i#g <br />Sheet asphalt <br />Asphaltic concrete <br />res. inlets <br />reset. M. H. C. <br />Water Conn.L. S. <br />Water Conn. S. S. <br />sewer coon <br />n <br />Albert Const. Co. <br />Rieth Riley Co. <br />Williston Cp. <br />.20 <br />.20 <br />.20 <br />.50 <br />r 0 <br />50 <br />.40 <br />.40 <br />.40 <br />I.00 <br />I.00 <br />I.00 <br />2.74 <br />2.75 <br />2.73 <br />2.61 <br />2.63 <br />2.58 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />34,00 <br />32.00 <br />32.50 <br />24.00 <br />26.00 <br />25.00 <br />1.50 <br />100 <br />I.00 <br />1.00 <br />8 pipe • <br />Pavement of Ist. alley -lest of McPherson Street from Division Street <br />to Napier under Improvement Resolution No.I876. <br />J. A. Barnex <br />grading 1,25 <br />concrete pavement 2.40 <br />S. fit.. Inlets <br />Reset inlets and manholes <br />sewer cone and 8" pipe <br />Carl Zimmer <br />I.20 <br />2.50 <br />Alex Bukowski <br />.80 <br />2.30 <br />I2.00 <br />5.00 <br />I.00 <br />11 <br />0 <br />0 <br />