My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Utility Billing System - North Star Utilities Solutions - Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Utility Billing System - North Star Utilities Solutions - Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:50:43 AM
Creation date
1/24/2018 9:18:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NORTHISTART" <br />Legend: <br />L = Low (Less than 20% of Time) M= Medium (Between 20%-50% of Time) H = Over 50% of Time <br />The following matrix provides an overall view of the phases that the City's resources will be involved and <br />their expected level of involvement throughout the project. <br />Legend: <br />L = Low (Less than 20% of Time) M= Medium (Between 20%-50% of Time) H = Over 50% of Time <br />Phase I: Solution Definition <br />Document for NorthStar all batch processes, external interfaces, and user -added applications. <br />Ensure that the underlying infrastructure for the NorthStar CIS solution is acquired and installed by the <br />required time as per the agreed upon project plan. Note: Minimum specifications for servers and <br />workstations should be discussed and agreed upon at the commencement of the project. <br />Ensure the staff members that have been identified to participate in each of the Discovery sessions are <br />available on the agreed upon scheduled dates. <br />Phase II -III: Solution Design / Configuration / Construction <br />Ensure that staff identified for configuration and training are available on the agreed upon scheduled <br />dates. <br />NorthStar Proposal Response — South Bend Indiana <br />
The URL can be used to link to this page
Your browser does not support the video tag.