Laserfiche WebLink
REGULAR MEETING <br />DECEMBER 21, 2017 412 <br />AWARD BID — IRONWOOD DRIVE. SIDEWALK, EDISON ROAD TO S.R. 23 — PROJECT <br />NO. 117-033A (LRSA) <br />Mr. Roger Nawrot, Engineering, advised the Board that on December 12, 2017, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Nawrot <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Walsh & Kelly, Inc., 24358 S.R. 23, South Bend, IN 46614, in unit prices not to exceed <br />$182,984.50. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the <br />bid be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — JEFFERSON AND TWYCKENHAM SIGNAL IMPROVEMENTS — <br />PROJECT NO. 116-027 (LRSA) <br />Mr. Roger Nawrot, Engineering, advised the Board that on December 12, 2017, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Nawrot <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Martell Electric, LLC, 4601 Cleveland Road, South Bend, IN 46628, in unit prices not to exceed <br />$197,157.47. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the <br />bid be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — REPAIR AND INSTALLATION OF OVERHEAD DOORS FOR ALL CITY <br />DEPARTMENTS — SPEC AJ (VARIOUS DEPARTMENT'S OPERATING BUDGETS) <br />Mr. Adam Parsons, Central Services, advised the Board that on December 12, 2017, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Parsons <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Industrial Door of Northern Indiana, 3839 S. Main Street, South Bend, IN 46614, in hourly rates <br />as listed. Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid <br />be awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD BID — OLD CLAY UTILITIES SEWER LINING — PROJECT NO. 117-087 <br />(UTILITIES/CONTRACTUAL SERVICES/OTHER) <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on December 12, 2017, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Doudrick <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Selge Construction Co., Inc., 2833 S. I Ph Street, Niles, MI 49120 in the amount of $205,745. <br />Therefore, Ms. Dorau made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Mr. Mueller seconded the motion, which carried. <br />AWARD QUOTATION — 2017-2018 TRAFFIC LOOPS — PROJECT NO 117-124 (LRSA) <br />Mr. Roger Nawrot, Engineering, advised the Board that on December 19, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Nawrot recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Pemberton Davis Electric, Inc., 916 E. McKinley Avenue, Mishawaka, IN 46545, in the <br />amount of $55,400. Therefore, Ms. Dorau made a motion that the recommendation be accepted <br />and the quotation be awarded as outlined above. Mr. Mueller seconded the motion, which <br />carried. <br />AWARD QUOTATION — NAVARRE STREET MILLING AND ASPHALT OVERLAY <br />PROJECT NO. 117-128 (LRSA) <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on December 19, 2017, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Ms. Doudrick recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Walsh & Kelly, Inc., 24358 SR 23, South Bend, Indiana 46614, in the <br />amount of $42,503.50 for the Base Bid plus Alternate No. 1. Therefore, Ms. Dorau made a <br />motion that the recommendation be accepted and the quotation be awarded as outlined above. <br />Mr. Mueller seconded the motion, which carried. <br />AWARD QUOTATION — DOWNTOWN BRIDGES STRIPING PROJECT NO 117 129 <br />LRSA <br />Ms. Sue Ellen Doudrick, Engineering, advised the Board that on December 19, 2017, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Ms. Doudrick recommended that the Board award the contract to the sole responsive and <br />responsible bidder, The Airmarking Co. Inc., 1544 N.SR 25, PO Box 526, Rochester, IN 46975, <br />in the amount of $72,500 for the Base Bid plus Alternate No. 2. Ms. Doudrick noted that the <br />