Laserfiche WebLink
REGULAR MEETING DECEMBER 12, 2017 393 <br />amount of $3,210. Therefore, Ms. Maradik made a motion that the recommendation be accepted <br />and the quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />AWARD QUOTATION — COLLEGE AVENUE & SUNNYMEDE AVENUE TRAFFIC <br />CALMING — PROJECT NO. 117-113 (LRSA� <br />Mr. Roger Nawrot, Engineering, advised the Board that on November 28, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Nawrot recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Selge Construction Co., Inc., 2833 S. IIth Street, Niles, MI 49120, in the amount of <br />$37,400. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />AWARD QUOTATION — SOLAR RADAR SPEED DISPLAY SIGNS — PROJECT NO 117- <br />113A (LRSA) <br />Mr. Roger Nawrot, Engineering, advised the Board that on November 28, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Nawrot recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Pemberton Davis Electric, 916 E McKinley, Mishawaka, IN 46545, in the amount of <br />$25,420. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />AWARD QUOTATION — YORK ROAD SEWER REPAIRS — PROJECT NO 115-139R <br />LRSA <br />Ms. Tara Weigand, Engineering, advised the Board that on October 24, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Weigand recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, C&E Excavating, Inc., 53767 County Road 9, Elkhart, IN 46514, in the <br />amount of $63,388.20 for Division A, Division B, and Alternate 1. Therefore, Ms. Maradik made <br />a motion that the recommendation be accepted and the quotation be awarded as outlined above. <br />Ms. Dorau seconded the motion, which carried. <br />AWARD QUOTATION — CENTURY CENTER VESTIBULE HEATER — PROJECT NO 117 <br />044 (HOTEL/MOTEL TAX) <br />Ms. Tara Weigand, Engineering, advised the Board that on November 28, 2017, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Weigand recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Edward J. White, Inc., 1011 S. Michigan Street, South Bend, IN 46601, in <br />the amount of $32,205. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Ms. Dorau seconded the motion, <br />which carried. <br />APPROVE CHANGE ORDER NO. 3 — 2016 MANHOLE AND SEWER LINING — PROJECT <br />NO. 116-026 (SEWER CONTRACTUAL SERVICE) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br />of Insituform Technologies USA, LLC, 17988 Edison Avenue, Chesterfield, MO 63005, <br />indicating the contract amount be increased by $2,698.50 for a new contract sum, including this <br />Change Order, in the amount of $2,996,336.05. Upon a motion made by Ms. Maradik, seconded <br />by Ms. Dorau and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — NEWMAN CENTER SITE DEVELOPMENT <br />DIVISION B AND C — PROJECT NO. 117-060R (REDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of HRP Construction, Inc., 5777 Cleveland Road, South Bend, IN 46624, indicating the contract <br />amount be increased by $22,403.42 for a new contract sum, including this Change Order, in the <br />amount of $206,756.54. Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and <br />carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 16 — SOUTH BEND ONE-WAY TO TWO-WAY <br />CONVERSION —PROJECT NO. 116-001B (LOIT) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 16 on behalf <br />of Rieth-Riley Construction, Inc., 25200 State Road 23, South Bend, IN 46614, indicating the <br />contract amount be increased by $41,040 for a modified contract sum, including this Change <br />