My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/1929 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1929
>
07/02/1929 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:48:14 AM
Creation date
12/21/2017 12:03:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/2/1929
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'423 <br />Tuesday, July 2nd., I929. <br />• <br />• <br />• <br />0 <br />Final Estimate f. tl-ie_simprovement No.2I88 known as the pavement on Carlisle <br />Street from 'Nashing on Avenue to ijinden Street, a 1_thorized by the resolution of the <br />3aard. of Public 'Ior'�s adopted on the 26th. , day of ?February 2929, and signed by the <br />Board of Public Works on the part of the City of South Bend, Indiana, and by the <br />';`Jilliston Construction Company as contractors Said tavement has been completed in <br />accordance with the above mentioned contract and resolution, and the Final Estimate <br />is as follows, to -wit: <br />7I.6 <br />sq. feet conerel e ,ialk <br />.25 <br />I7.90 <br />88.3 <br />lin. feet concrete curb <br />@ <br />.50 <br />44.I5 <br />183.I <br />lin. feet marginal curb <br />? <br />.40 <br />73.24 <br />495 <br />cu. ,yds grading <br />.80 <br />396.00 <br />I877.8I <br />sq. yds sheet as-phalt pavement <br />? <br />2.65 <br />4,976.20 <br />8 <br />storm water inlets <br />12.50 <br />100.00 <br />420 <br />lin. feet 8 inch pipe <br />1.00 <br />420.00 <br />I <br />manhole complete <br />Cu <br />90.00 <br />90.00 <br />8 <br />R" water tal long <br />0 <br />22.50 <br />I80.00 <br />Amount due contractor <br />6027.49 <br />advertising <br />42.00 <br />abstracting <br />6.90 <br />chemical inspection <br />56.33 <br />municipal inspection <br />57.00 <br />total cost <br />6,459.72 <br />Final_ estimate of the improvement kno7.-rn as No.4I4I for the pavement on <br />Greenlawn Avenue From the south line of Ye-Kinley Avenue to the north line of ` ashington <br />Street authorized by the resolution of the Board of Public `forks adopted of the I6th., <br />daj of October 1928, and signed by the, Board of Public storks on the part of the City <br />of South Bend, Indiana, and by the "dilliston Construction Company as contractor. Said <br />pavement has been completed in accordance with the above mentioned contract and resole <br />:ion, and the Final estimate is as follows. -to -wit: <br />2,993 <br />sq. ,yds pavement <br />f <br />2.65 <br />72931.45 <br />I,002 <br />cu yds grading <br />C <br />.90 <br />901.80 <br />28 <br />lin ft marginal curb <br />.40 <br />ii.20 <br />2 <br />manhole covers reset <br />r <br />3.00 <br />6.00 <br />2 <br />storm water inlets <br />I2.50 <br />25.00 <br />2 <br />storm water inlets reset <br />C <br />3.00 <br />6.00 <br />324 <br />Lin feet 8 " pipe <br />t <br />I.00 <br />324.00 <br />I3 <br />new 3" long water conn <br />C <br />30.00 <br />390.00 <br />Amount due contractor <br />advertising <br />adbstracting <br />chemical inspection <br />Yunicipal inspection <br />Engineering <br />Total cost <br />.45 <br />t 42.00 <br />I0;20 <br />89.79 <br />95.00 <br />479.77 <br />10,577.21 <br />Final Estimate of the improvement know as No.2IO2 for the pavement and sewer <br />in Lincoln Terrace Addition authorized b-r the resolution of the 3oard of Public forks <br />adopted on the 27th. day of June I928, and signed by the Board of Public Ilorks on the <br />part of the City of Louth Bend, Indiana, and by the Williston Construction Company as <br />contractor. maid pavement and sewer has been completed in accordance with the above <br />mnetioned contract and resolution, and the Final estimate is as follows: <br />279,356 sq. .yds pavement el 2.48 671842.88 <br />7,399 cu yds grading P .80 5,919.20 <br />326 lin ft straight curb � .50 IG3.00 <br />636 lin ft. marginal curb .40 254.00 <br />2,184 lin feet 8" pipe n I.00 2,I84.00 <br />49 storm water inlets e I2.50 6I2.50 <br />• I2 manholes reset � 3.00' 36.00 <br />9I new 3" water taps (30)lon e; 28.00 2,548.00 <br />66 new 3" water taps (3M short c 22.00 I,452900 <br />I4 new 3" long taps (401) 33.00 462.00 <br />I4 new short taps (401) 28.00 392.00 <br />4,I3? Lin feet I2" pipe C 2.95 I2,189.40 <br />29368 Lin feet 6" pipe P 1.00 21368.00 <br />I4 manholes complete C 85.00 I, I90.00 <br />amount due contractor 7, I3.3 <br />engineering 49880.66, <br />municipal inspection 503.50 <br />chemical inspection 820.68 <br />. advertising 42.00 <br />abstracting 47.85 <br />Total cost 103,908.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.