My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/02/1929 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1929
>
07/02/1929 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:48:14 AM
Creation date
12/21/2017 12:03:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/2/1929
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
22 <br />4 Tue-sday, eTuly 2nd. , 1929. <br />City 4agineer, TT. G. `Ira.y, filed the following FIi?ATa FSTIT-ATTS <br />which were approved by the Board: <br />Final estimate for improvement No.2064 for the. pavement on 22nd. <br />Street from the south line of Pleasant ''treet to the north end of river bridge, author ` <br />ized by resolution adopted by the Board of Public `Yorks on the 27th., day of June I928,: <br />and signed by the Board of Public "='storks on the part of the City of South lend, Indiana <br />and by the Albert Construction Company as contractor. Said pavement has been com-nleted <br />in accordance with the above mentioned contract and resolution and the Final estimate is <br />is as follows: <br />4)5 sq yds concrete pavement (7 2.40 I'188.00 <br />I432.5 sq. ft. wal'c .20 286.50 <br />237.8 Lin feet curb .75 178.35 <br />2 storm ,water inlets 18.50 37.00 <br />100 lin feet 9 pipe r, I.00 I00.00 <br />267 cu ,yds grading 01 .80 213.60 <br />amount due contractor 20003.45 <br />municipal inspection 9.50 <br />Total cost 2-31� <br />Final estimate for improvemient _To.21L89 for the pavement on Poland Street <br />fromarr-:s street to the T?. v. C. authorized by the resolution of the Board of <br />Public °or'Cs adopted on the 26th. ,, da.v of F"ebruarjr I929, and signed by the Board of <br />Public `°or' s can the part of the pity and by the "filliston Construction Company as <br />Contractor. Said -pavement has been com- <br />pleted in accordance with the above mentioned <br />contract and resolution and the Final Estimate is as follows, to -wit: <br />596.8 Lin feet concrete curb P,. .50 298.40 <br />67.5 Lin feet marginal curb C..40 27.00 <br />3I8 Cu yards 'grading f .80 254.40 <br />I32I.26 &j. yds pavement 2.65 31,501.34 <br />142 Lin feet 8 Inch pipe ft I.00 142.00 <br />5 3 r' sho ert water conn. e 19.00 95.00 <br />I Aanhole complete c 90.00 90.00 <br />Amount due contractor 4,408.I4 <br />Adtrert is ing 42.00 <br />Absteacting 6.25 <br />Chem inspection 39.64 <br />Funicipal inspection 38.00 <br />Total cost 4, 5 3 3 <br />***************************** *****************:;* * * * * * * ><* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * <br />FI]TAL;STI?TAT^ for the improvement No.2I70 as the ;pavement on <br />Liston Street from Walnut 'street to ''tudebaker Streetm authorized by the resolution <br />of the Board of Public elor'cs adorted on the 5th. , day of December I928 and signed by <br />the Board of ??ublic 14orks on the -part of the �'ity of "outh Bend, Indiana and by the <br />Albert Construction Company as contractor. .''aid pavement has ben completed in accord <br />ance with the above mentioned contra t and resolution, and the Final Estimate is as <br />follows, to -wit: <br />42.5 <br />s-1. ft concrete walk <br />.20 <br />8.50 <br />I46.I <br />Lin feet concrete curb <br />(7) <br />.50 <br />83.05 <br />340 <br />cu Xds grading (cut) <br />a, <br />.90 <br />306.00 <br />I00 <br />on yds grading (Fill) <br />(11 <br />.90 <br />90.00 <br />I098;16 <br />sq yds concrete <br />r <br />2.50 <br />21,745.40 <br />4 <br />storm water inlets <br />e <br />I2.50 <br />150.00 <br />4" <br />water corn l.s. <br />P <br />24.00 <br />96.00 <br />`1. 3" <br />water cone. s.s. <br />01 <br />I9.00 <br />I33.00 <br />220 Lineal feet 8 inch pipe <br />c <br />1.00 <br />220.00 <br />amount due contractor <br />3,73I.95 <br />advertising <br />42.00 <br />abstracting <br />3.15 <br />Tunicipal inspection <br />47.50 <br />Total cost <br />3,8 24. <br />******** * c****7-"******************************?****,=-********************************** <br />• <br />• <br />• <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.