My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - SmithGroupJJR - Schematic Designs for Various Pedestrian Crossings
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - SmithGroupJJR - Schematic Designs for Various Pedestrian Crossings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:13:13 AM
Creation date
12/13/2017 3:37:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SMITHROUPIM <br />Design and Engineering Fees Base Fee <br />Technical Studies and Assessments .................................. .... <br />Survey —Topographic/Boundary <br />Geotechnica|Review and Utility Engineering <br />Site Review <br />Planning and Design ........ ..................................................... $Y&000 <br />Workshops and Stakeholder Meetings <br />Design Description and Basis ufDesign <br />Schematic Design — Building and Site <br />Schematic Level Opinion OfConstruction Costs <br />Documentation ����.�����.������������.���TBD <br />Preliminary Engineering <br />Permitting <br />Final Engineering and Construction Documents <br />Implementation'~~~_~,~~----..__~~~~ ........... ......... TBD <br />Construction Meetings and FieWWeH� <br />RF|o.Clarifications and Submittals <br />Reommj Drawings and Closeout <br />Occupancy.............................................................. ~........ ~~....... TBD <br />Warrantees and Occupancy Reviews <br />Maintenance Manual <br />Total Labor Fee .......................... --- ....... ---- .................... $184,20W <br />Ram <br />1.Wehave not included permitting, agency review and/or approval review fees and costs in our professional <br />service fee. <br />Z Testing and inspection services will berequired' during construction; these services and the associated fees <br />are not included and will bompart oYthe construction budget and phase. \1|sexpected that these services <br />will heprovided directly 0oand paid for bythe CITY during construction, <br />3. We have not included any costs for stabilization, repairs, modifications, or improvements to the existing river <br />edge inciudiing sheeting, or revetment associated with the river edge protection. VVohave included o <br />cursory review of the condition, of the river edge bulkhead; however, this assessment is not detaiied and <br />does not include test pits, below water inspection orstructural testing. |(Wiwdetermined, once Notre Dame <br />work has commenced, that 3dd|t|oOai inspections including test pits and dive inspections, these services <br />can boadded hothe contract anonadditional service scope and fee. <br />City ofSouth Bend, Indiana Seitz Park RedevelopmentFinal Design and Implementation @mithGmuoJJR <br />South Bend, Indiana <br />LETTER FORM PROPOSAL -12- Revised f113X0117,Y1108120Y7,1ON6/Z 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.