Laserfiche WebLink
SMIT11GROUNJR <br />The following Scope of Services outlines the steps necessary to successfully implement Seitz Park. <br />f i r,Jk 'i, 1 I � i i k,,fl ",1 � id (-, dm i A,,,,ic-,,&'I <br />• Survey — Boundary and Topographic — supplement Notre Dame and Abonmarche surveys as needed — this <br />work will be done, by Abonmarche and is a supplement to the work previously prepared by Abonmarche on <br />behalf of the CITY, <br />• Utility and Infrastructure Preliminary Engineering — gather data for all underground and overhead utilities, <br />determine the impact of the park reconstruction and develop a schematic utility improvement and <br />modification plan based on the proposed design and the coordination with Notre Dame. This plan will be <br />used for the basis of developing project cost estimates, <br />• GeotechnicM Review — we have not included scope and fees associated with, geotechnical and soils <br />explorations. A review of previous work, provided by Wharf Partners and Notre Dame will be used to <br />establish the basis of costing pavement sections, utility construction, earthwork and foundations. <br />• Site Review and Exploration — document literature search, visual inspection of river edge conditions, <br />• Stormwater management — develop a strategy for managing the stormwater along the riverfront and within <br />the park, <br />Survey services will be provided by our team's local partner and will include the landside topographic survey needed <br />to understand the relationship between the land and the river required to design and engineer any elements of the <br />park, This work is to supplement the work previously performed for the CITY, and will be supplemented with <br />information from Wharf Partners and Notre Dame including bathymetry of the river. Geotechnical engineering will be <br />provided by DLZ and will include review of previous soil borings necessary to engineer the building and canopy <br />structure foundations as well as the sampling that maybe required to explore the existing river edge conditions in <br />order to inform the project design and construction costs estimate. <br />Coastal assessment is limited to the conditions of the river edge, and the water fluctuations and ice assessment <br />necessary to ensure proper design and engineering of the riverfront, including the establishment of the required <br />elevation of the Riverfront Promenade. We have not included any detailed desktop or physical modelling or technical <br />coastal engineering studies, nor have we included any analysis to determine floodway and flood plain. The floodway <br />and flood plain will be based on available FEIVIA and or other data. <br />A brief review of the existing river edge conditions will be performed from land to determine any issues that may <br />impact the design of the Seitz Park. We will also perform a literature search and research to uncover any documents <br />that detail the engineering and design of the existing river edge. <br />These services will be performed at the earliest stage of the project to inform the design and documentation of Seitz <br />Park. <br />kid" ), Pkirinhnq and <br />• Design Work Sessions — explore design details with the CITY, <br />• Programming — building program and use and site space planning needs determination. <br />• Stakeholder Meetings — meetings with adjacent condominium owners and property owners, CITY <br />committees and leadership. <br />City of South, Bend, Indiana Seitz Park Redevelopment Final Design and Implementation SmithGroupJJR <br />South Bend, Indiana <br />LETTER FORM:, PROPOSAL -6- Revised 11130117, 1110912017, 10/16/2017 <br />