Laserfiche WebLink
SMiTHGAOUPll'+ <br />and its team to ensure all existing utilities are rerouted, abandoned or preserved to meet the needs of the park <br />reconstruction. Also included is the necessary coordination with the Architect to ensure proper routing, servicing, and <br />design of all utilities required to serve the buildings and facilities. These efforts include the performance/stage area, <br />site lighting and lighting/electrical needs for other site amenities, the electrical/telecommunication/d',ata engineering <br />and distribution to serve, the park, and other electrical needs of the park based on the approved design, DLZ will also <br />coordinate the needs of any penetrations and special needs of the Notre Dame hydro facilities to meet the needs of <br />the park and facilities. DLZ will also provide traffic engineering and construction documentation associated with all <br />work along Colfax Ave. between MILK and Sycamore. For the schematic design phase, this will include identifying <br />technical issues associated with the proposed work and any additional studies necessary to obtain approvals through, <br />jurisdictional agencies associated with the bridge and Right -of -Way to accommodate a wider bike/pedestrian path, <br />lane width reductions and crossings to accommodate trail connections. For phases of work beyond the SD Phase, <br />documentation will be provided for the planned crossings at MLK and Sycamore to achieve connection to Seitz Park, <br />Services will include all phases of the project including, concept development, schematic design, design development, <br />construction documents, bidding and construction ad�ministrationi. Construction cost estimates for the civil <br />engineering and related systems and facilities will also be a part of DLZ's scope of services. Design reviews, both <br />internal to DLZ, as well as quality reviews and compatibility checks will also be required at each phase of the project, <br />as timed within the overall project schedule. <br />In addition, to the above, other DLZ responsibilities include: <br />• The preparation of a site engineering basis of design (based on above responsibilities), <br />• Integration of the site sustainability goals into the civil engineering elements of the park. <br />• Weekly project team meetings, typically via WebEx. If other project related meetings are required, such as <br />owner and coordination meetings with Wharf Partners and Notre Dame these will take place in place of the <br />weekly meeting. <br />• Documentation of meetings/discussions related to alll civil engineering elements of the project. <br />• Coordination with Architect to ensure building services are met, <br />• Coordination with all utility providers. <br />• SmithGroupJJR will establish the stormwater management approach — DLZ will be responsible for all <br />drainage including storm sewers, catch basins, quality control devices and all other storm drainage related <br />appurtenances,. Grading coordination will also be required. <br />• Traffic engineering required for access/egress requirements of the park, including geometry, configuration, <br />and control of Ginitz Avenue, from Colfax Avenue to the park proper (and serving the other existing and <br />proposed developments). <br />• Traffic engineering and documentation required for the proposed pedestrian crossings at Sycamore and <br />MILK <br />DLZ will develop a detailed Scope of Services for the entire project and a fee for Schematic Design only and submit <br />to SmithGroupJJR for review and discussion. A fee range for services beyond Schematic Design will be provided as <br />well. Detailed site investigations, such as geoteclhnical investigations and bridge analysis, should be excluded from <br />the initial Schematic Design fee. <br />City of South Bend, Indiana Seitz Park Redevelopment Final Design and Implementation SmithGroupJJR <br />South Bend, Indiana <br />LETTER FORM PROPOSAL - 6 " Revised 11130117, 1110912017, 10/16/2017 <br />