Laserfiche WebLink
SMfTNGROUPJ{R <br />SmithGroupJJR Role andl Responsibilities <br />Smi1thGroupJJR will be the prime consultant, responsible, for the overall design of the park and its elements. We will <br />manage the subconsultants, lead the design, stakeholder coordination, will coordinate with IDNR and any other <br />agencies, Wharf Partners, Notre Dame and its team, the City, County and State as required through the project <br />design and approval process. Ali correspondence, decisions and directions will flow through us, and we will work <br />directly with the CITY's Project Manager to ensure the schedule, budget, communication and coordination goals are <br />met. <br />Specifically, the role and responsibility of SmithGroupJJR will be as follows: <br />• Overall project coordination and design leadership. <br />• Urban design, including park elements, surface and streetscape design, promenades and program spaces. <br />• Waterfront engineering, including technical design and engineering of promenades, portages, wails, <br />overlooks, etc, <br />• Landscape architecture, including special surfaces, plazas, plantings, irrigation design, furnishings, light <br />fixture selection, screening and image areas. <br />• Site engineering, including stormwatier management, green infrastructure and sustainabiIity elements, <br />circulation and access/egress control, <br />• Special lighting design, including landscape and image lighting. We will work with the River Lights Designer <br />to, ensure proper placement and calibration of the River Lights installation. <br />SmithGroupJJR will lead the design and engineer/document the following: <br />• Riverfront Promenade <br />• East Bank Promenade <br />• Riverfront Trail Connection between Seitz and Howard' Park <br />• Seitz Park Proper —except as modified and required of EPOCH and DLZ <br />• Colfax Avenue Crossing — engineering by DLZ, streetscape improvements in concert with IRiverfront <br />Promenade Plaza development <br />• East Race Crossing Design — explore best option between upgrading existing crossing at dam or a new <br />prefabricated bridge <br />• AM General property reconstruction <br />• Colfax Trail/Bridge connection between Seitz and West Bank Trail. <br />EPOCH Architects Role and Responsibilities <br />EPOCH will serve as the Architect of Record for the park buildings. They will provide design and documentation <br />services for all building related architecture, including interior design, mechanical engineering including internal <br />HVAC, equipment and all mechanical facilities to meet the needs of the building and utilities, interior lighting and <br />electrical engineering including instrumentation, controls, security, specialty and security/task lighting, <br />telecommunications, fiber optics, data, internet,, cable and all other needs to serve the building (inside and outside) <br />and its function. Also included is, alll structural engineering for building superstructure and foundations, including <br />coordination with the Notre Dame, Team to ensure building structural: requirements are met in both flume and site <br />areas within the building footprint. Coordination with Notre Dame for any penetrations or other specialty elements to <br />meet the needs of the building is also included. <br />City of South Bend, Indiana Seitz Park Redevelopment Final Design and Implementation SmithGroupJJR <br />South Bend, Indiana <br />LETTER FORM PROPOSAL -3- Revised 11130117, 1110912017, 10116/2017 <br />